Statewide Oregon Road Conditions

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

Closure

US199, Oregon - California Border MP 42

Highway 199 will be closed in California between 8am and 11am and 1pm to 4pm Monday through Friday.

Crews are working in areas affected by recent wildfires, from Patrick’s Creek to the Collier Tunnel (MP 19-33.5). The road will be open to one-way controlled traffic at all other times, including nights and weekends. Travelers should anticipate up to one-hour delays during all open hours. THIS SCHEDULE IS SUBJECT TO CHANGE. Check Caltrans QuickMap at https://quickmap.dot.ca.gov for updates before traveling.

Updated
9/27/2023 2:20:00 PM

Closure with Detour

ORE281, 1 mile South of Hood River MP 2

Single lane closures on OR 281 at Orchard Road 8 a.m. to 3:30 p.m. Monday through Friday.

Flaggers directing traffic as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21537)

Updated
9/10/2023 12:45:00 PM

Closure with Detour

ORE153, Amity MP 6

Bridge work has closed the road. Follow detour.

<!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20445)

Updated
9/9/2023 4:34:00 PM

I-105: MP 1.71
I-105, Eugene

Commercial Vehicle Information
Informational only
Details
I-105/OR126 EB MP 1.61 to MP 1.62 (Eugene) Effective September 25, 2023, this section of I-105/OR126 eastbound will be closed at night between the hours of 9:30 PM & 5 AM. The estimated completion date for this project is September 28, 2023.
Last Updated
9/27/2023 7:00 PM

I-105: WB MP 3.49 to 0.9
I-105, Intersection with Pacific Highway I-5

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Expect nighttime, single lane closures, Sunday night through Friday morning, 7:30 p.m. to 5:30 a.m. Temporary Work Zone Speed Reduction of 45 m.p.h. will be in effect when crews are working. Signs will be posted notifying drivers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21538)
Last Updated
9/26/2023 9:19 AM

I-205: NB MP 6.4
I-205, Oregon City, Intersection with 10th St

Crash/Hazard
Informational only
Comments
A stall has the NB right lane closed at 10th Ave. Prepare to slow or move over for worker safety.
Last Updated
8/31/2023 12:50 PM

I-205: MP 8.29 to 9.23
I-205, West Linn

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 8.12 to MP 9.25 (West Linn) Effective August 7, 2023, this section of I-205 northbound will be intermittently restricted to 15 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads over 15 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 15, 2023.
Last Updated
9/27/2023 7:00 PM

I-205: SB MP 8.32 to 11.06
I-205, West Linn

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime lane closures on I-205 north and south 10 p.m. to 5 a.m. Speeds reduced. Single lane closures on Clackamette Drive, Willamette Falls Drive and OR 43 north. Auxiliary lane closure on OR 99E north. Pedestrian detours on OR 43 and OR 99E. Nighttime closures of the I-205 south off-ramp to OR 99E from 10 p.m. to 5 a.m.
Last Updated
9/24/2023 9:17 AM

I-205: MP 8.64 to 9.51
I-205, Abernethy Bridge

Commercial Vehicle Information
Informational only
Details
I-205 NB MP 8.51 to MP 9.51 (Oregon City) Effective September 25, 2023, this section of I-205 northbound will be restricted to 12 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 29, 2023.
Last Updated
9/27/2023 7:00 PM

I-205: MP 9.031
I-205, Abernethy Bridge

Commercial Vehicle Information
Informational only
Details
I-205 NB on-ramp from OR43 NB (West Linn) Effective June 15, 2023, the I-205 northbound on-ramp from OR43 northbound will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this work is October 1, 2023.
Last Updated
9/27/2023 7:00 PM

I-205: MP 9.51
I-205, Abernethy Bridge

Commercial Vehicle Information
Informational only
Details
I-205 SB MP 9.47 to MP 9.33 (Oregon City) Effective August 21, 2023, this section of I-205 southbound will be intermittently restricted to 12 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM & 5 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 6, 2023.
Last Updated
9/27/2023 7:00 PM

I-205: NB MP 21.1 to 22
I-205, Interstate 84

Construction Work
Estimated delay under 20 minutes
Comments
Shoulder closure on I-205 north between Glisan Street and Exit 22, on I-84 east and west. Nighttime lane closures in both directions of I-84. Nighttime closures of Exit 7 to Halsey Street from I-84 east.
Last Updated
8/20/2023 2:39 PM

I-5: NB MP 0 to 11.4
I-5, Oregon - California Border

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 2 Lanes , Shoulder (Northbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect delays. Beginning June 8, watch for single-lane traffic southbound at the Exit 6 bridge for corrective deck seal repairs. Rolling slowdowns will be occurring for rock scaling work on the Siskiyou Summit. The southbound on-ramp will also close for this work. Follow detours on Old Siskiyou Hwy to Exit 1 southbound. Contractor will switch to Exit 6 northbound off-ramp closure for about the same duration in June.
Last Updated
8/19/2023 7:37 AM

I-5: MP 1 to 11

Snow Zone
Informational only
Affected Area
Siskiyou Summit (Elev. 4310) - California State Line to the Talent Exit
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

I-5: MP 11.96
I-5, 3 miles South of Ashland

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 11.93 to MP 11.96 (Ashland) Effective June 7, 2023, this section of I-5 northbound will be intermittently restricted to 16 feet 3 inches in height, I-5 southbound will be intermittently restricted to 16 feet 7 inches in height Sunday through Thursday nights between the hours of 7 PM & 7 AM. Loads over 16 feet 3 inches in height northbound and 16 feet 7 inches in height southbound may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 26, 2023.
Last Updated
9/27/2023 7:00 PM

I-5: NB MP 14.7
I-5, Ashland

Construction Work
No to Minimum Delay
Lanes Affected
(Southbound) 2 Lanes (Northbound) 2 Lanes
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. The East Main Street Bridge over I-5 reopens Friday, June 9. The contractor is switching to the Oregon 66 Ashland Street Bridge over the railroad tracks. Watch for single-lane traffic in each direction and lane transitions on Ashland Street for the next 10 weeks for bridge deck rehabilitation.
Last Updated
6/20/2023 3:59 AM

I-5: MP 18.86 to 11.54
I-5, 4 miles North of Ashland

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 11.44 to MP 19.00 (Ashland) Effective June 7, 2023, this section of I-5 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 26, 2023.
Last Updated
9/27/2023 7:00 PM

I-5: SB MP 19 to 11
I-5, 4 miles North of Ashland

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
8/07/2023 1:58 AM

I-5: NB MP 21.7
I-5, 7 miles North of Ashland

Construction Work
No to Minimum Delay
Lanes Affected
(Southbound) , Shoulder (Northbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
9/18/2023 1:47 PM

I-5: NB MP 33
I-5, Central Point

Construction Work
No to Minimum Delay
Lanes Affected
(Southbound) 2 Lanes , Shoulder (Northbound) 2 Lanes , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
7/27/2023 7:37 AM

I-5: NB MP 58
I-5, Intersection with Pacific Highway ORE99

Construction Work
No to Minimum Delay
Lanes Affected
(Southbound) , Shoulder (Northbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Watch for possible shoulder closures under the I-5 Exit 58 bridges through May. The contractor is strengthening these bridges to better withstand earthquakes.
Last Updated
6/12/2023 2:24 AM

I-5: MP 66 to 81

Snow Zone
Informational only
Affected Area
Smith Hill (Elev. 1730'), Stage Rd Pass (Elev. 1830') and Sexton Mountain Pass (Elev. 1960') Summits - Grants Pass to the Glendale Exit
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

I-5: NB MP 72.5
I-5, 4 miles South of Wolf Creek

Crash/Hazard
No to Minimum Delay
Comments
High water is causing minimal delay to traffic. Use caution.
Last Updated
9/25/2023 5:18 PM

I-5: SB MP 74
I-5, 2 miles South of Wolf Creek

Crash/Hazard
No to Minimum Delay
Comments
A vehicle fire has occurred causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
9/27/2023 8:51 PM

I-5: NB MP 81 to 89
I-5, 5 miles North of Wolf Creek

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 2 Lanes , Shoulder (Northbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. For the week of May 28-June 3, no work is planned for Memorial Day (Sunday and Monday nights, May 28 and May 29). Northbound I-5 traffic will be limited to a single lane from 7 p.m. Tuesday to 9 a.m. Friday. Construction may require intermittent nighttime closure of the northbound ramps at Azalea (Exit 88), Barton Road (Exit 83) and Quines Creek (Exit 86). Detours will be provided, and signs posted during ramp closures. Watch for reduced speed limit of 55 mph.
Last Updated
8/28/2023 6:46 AM

I-5: MP 87.4 to 99.1

Snow Zone
Informational only
Affected Area
Canyon Creek Pass Summit (Elev. 2020') - Azalea to North Canyonville
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

I-5: MP 88.12
I-5, 10 miles South of Canyonville

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 88.12 (Azalea) Effective April 23, 2023, this section of I-5 southbound will be intermittently restricted to 16 feet 9 inches in height Sunday through Thursday nights between the hours of 7 PM & 9 AM. Loads over 16 feet 9 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 30, 2023.
Last Updated
9/27/2023 7:00 PM

I-5: MP 88.28 to 80.33
I-5, 10 miles South of Canyonville

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 80.91 to MP 89.54 (Azalea) Effective April 23, 2023, this section of I-5 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 9 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 30, 2023.
Last Updated
9/27/2023 7:00 PM

I-5: NB MP 104 to 130
I-5, 6 miles North of Canyonville

Construction Work
No to Minimum Delay
Lanes Affected
(Southbound) 2 Lanes , Shoulder (Northbound) 2 Lanes , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Watch for intermittent nighttime lane and shoulder closures along I-5 at MP 104, MP 119 and MP 130.
Last Updated
8/28/2023 6:47 AM

I-5: NB MP 118 to 126
I-5, 7 miles South of Roseburg

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. This project is mostly complete. No traffic impacts are expected this week.
Last Updated
6/12/2023 2:52 AM

I-5: MP 125.08 to 119.18
I-5, Roseburg

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 119.18 to MP 125.08 (Roseburg) Effective September 5, 2023, this section of I-5 southbound will be intermittently restricted to 16 feet 5 inches in height Sunday through Thursday nights between the hours of 9 PM & 7 AM. Loads over 16 feet 5 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 30, 2023.
Last Updated
9/27/2023 7:00 PM

I-5: MP 125.08
I-5, Roseburg

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 125.08 (Roseburg) Effective September 5, 2023, this section of I-5 northbound will be intermittently restricted to 16 feet 00 inches in height Sunday through Thursday nights between the hours of 9 PM & 7 AM. Loads over 16 feet 00 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 30, 2023.
Last Updated
9/27/2023 7:00 PM

I-5: MP 125.36 to 117.74
I-5, Roseburg

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 117.50 to MP 125.50 (Roseburg) Effective September 5, 2023, this section of I-5 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 7 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 30, 2023.
Last Updated
9/27/2023 7:00 PM

I-5: NB MP 127 to 158
I-5, 2 miles North of Roseburg

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 2 Lanes , Shoulder (Northbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. This project will improve drainage by adjusting or installing new inlets and storm sewer pipe. Grooves will be cut in the road surface to help water drain off the I-5 travel lanes. All work is expected to be completed by the end of August. Watch for intermittent nighttime lane and shoulder closures. Watch for construction vehicles entering and exiting the work zone.
Last Updated
6/20/2023 4:23 AM

I-5: MP 174.78 to 186.86
I-5, Cottage Grove

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 174.76 to MP 187.89 (Cottage Grove) Effective April 23, 2023, this section of I-5 northbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 5 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 15, 2023.
Last Updated
9/27/2023 7:00 PM

I-5: MP 184.24
I-5, 4 miles South of Intersection with Willamette Highway ORE58

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 184.24 (Cottage Grove) Effective April 23, 2023, this section of I-5 northbound will be intermittently restricted to 16 feet 10 inches in height Sunday through Thursday nights between the hours of 7 PM & 5 AM. Loads over 16 feet 10 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 15, 2023.
Last Updated
9/27/2023 7:00 PM

I-5: MP 184.24
I-5, 4 miles South of Intersection with Willamette Highway ORE58

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 184.24 (Cottage Grove) Effective April 23, 2023, this section of I-5 southbound will be intermittently restricted to 16 feet 5 inches in height Sunday through Thursday nights between the hours of 7 PM & 6 AM. Loads over 16 feet 5 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 15, 2023.
Last Updated
9/27/2023 7:00 PM

I-5: MP 186.43 to 175.03
I-5, 2 miles South of Intersection with Willamette Highway ORE58

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 187.89 to MP 174.76 (Cottage Grove) Effective April 23, 2023, this section of I-5 southbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 6 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 15, 2023.
Last Updated
9/27/2023 7:00 PM

I-5: SB MP 187.89 to 174.76
I-5, Intersection with Willamette Highway ORE58

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Expect northbound and southbound lane closures for bridge deck and roadway repairs Sun-Th, 7PM-6AM <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21540)
Last Updated
9/15/2023 12:32 PM

I-5: MP 241.42 to 239.35
I-5, 7 miles North of Albany

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 239.35 to MP 241.70 (Jefferson) Effective June 26, 2023, this section of I-5 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 30, 2023.
Last Updated
9/27/2023 7:00 PM

I-5: NB MP 250.2 to 254
I-5, 4 miles South of Intersection with ORE22, in Salem

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Exit 252 ramp closures 9pm - 5am, Sunday night - Thursday night. Use detour. I-5 paving from MP 253.72 - MP 250.53, 8pm - 5am, Sunday night - Thursday night. Expect delays.
Last Updated
9/27/2023 12:51 AM

I-5: SB MP 295.9 to 296.1
I-5, 1 mile North of Portland, Intersection with SW Capitol Highway

Construction Work
Estimated delay under 20 minutes
Comments
SW 26th Avenue under I-5 is closed through spring 2024. Periodic shoulder closures on I-5.
Last Updated
8/06/2023 9:11 AM

I-5: MP 300.73
I-5, Interstate 84

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 300.81 to MP 300.89 (Portland) On Sunday, October 1, 2023, this section of I-5 northbound will be closed between the hours of 6:00 AM and 2:30 PM for the Portland Marathon.
Last Updated
9/27/2023 7:00 PM

I-5: MP 302.29
I-5, I-405 North Interchange

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 302.29 to MP 303.10 (Portland) Effective October 25, 2023, this section of I-5 northbound will be restricted to 14 feet 00 inches in width, between the hours of 10 PM and 5 AM. Loads wider than 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 26, 2023.
Last Updated
9/27/2023 7:00 PM

I-5: MP 302.74
I-5, 1 mile North of I-405 North Interchange

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 302.74 (Portland) Effective October 25, 2023, this section of I-5 northbound will be restricted to 18 feet 06 inches in height, between the hours of 10 PM and 5 AM. Loads wider than 18 feet 06 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 26, 2023.
Last Updated
9/27/2023 7:00 PM

I-5: MP 308.38 to 308.18
I-5, Oregon Washington Border

Commercial Vehicle Information
Informational only
Details
I-5 SB MP 308.38 to MP 308.18 (Interstate Bridge-Portland) Effective October 14, 2023, this section of I-5 southbound will be closed nightly between the hours of 10 PM and 6 AM. The estimated completion date for this work is October 15, 2023.
Last Updated
9/27/2023 7:00 PM

I-84: MP 0 to 0.82
I-84, Interstate 5

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 0.00 to MP 0.90 (Portland) Effective October 13, 2023, this section of I-84 eastbound will be restricted to 12 feet 00 inches in width at night between the hours of 8 PM & 6 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 15, 2023.
Last Updated
9/27/2023 7:00 PM

I-84: MP 1.36 to 0.921
I-84, Portland, Intersection with Lloyd Blvd

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 0.921 to MP 1.36 (Portland) Effective October 13, 2023, this section of I-84 westbound will be intermittently restricted to 18 feet 00 inches in width at all hours. Loads over 18 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 15, 2023.
Last Updated
9/27/2023 7:00 PM

I-84: MP 1.74
I-84, Portland, Intersection with 33rd Ave

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 1.74 (Portland) Effective October 21, 2023, this section of I-84 westbound will be restricted to 16 feet 3 inches in height between the hours of 4 AM and 12 PM. Loads over 16 feet 3 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 21, 2023.
Last Updated
9/27/2023 7:00 PM

I-84: WB MP 2 to 9.7
I-84, Portland, Intersection with 33rd Ave

Construction Work
Estimated delay under 20 minutes
Comments
Shoulder closure on I-205 north between Glisan Street and Exit 22, on I-84 east and west. Nighttime lane closures in both directions of I-84 Nighttime closures of Exit 7 to Halsey Street from I-84 east.
Last Updated
8/20/2023 2:40 PM

I-84: MP 2.42 to 1.53
I-84, Portland, Intersection with 33rd Ave

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 2.50 to MP 1.40 (Portland) Effective October 21, 2023, this section of I-84 westbound will be restricted to 24 feet 00 inches in width between the hours of 4 AM and 12 PM. Loads over 24 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 21, 2023.
Last Updated
9/27/2023 7:00 PM

I-84: MP 4.11 to 7.1
I-84, Portland, Intersection with 58th Ave

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 4.10 to MP 7.22 (Portland) Effective Friday, October 6, 2023, this section of I-84 eastbound and westbound will be closed for the weekend starting at 10:00 p.m. and re-opening on Monday October 9, 2023. at 5:00 a.m.
Last Updated
9/27/2023 7:00 PM

I-84: MP 5.01 to 5.95
I-84, Portland, Intersection with 82nd Ave

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 5.00 to MP 6.00 (Portland) Effective August 8, 2023, this section of I-84 eastbound will be restricted to 14 feet 00 inches in width at night, between the hours of 9 PM & 5 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 20, 2023.
Last Updated
9/27/2023 7:00 PM

I-84: MP 5.74 to 5.76
I-84, 1 mile East of Portland, Intersection with 82nd Ave

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 5.74 to MP 5.76 (Portland) Effective May 21, 2023, this section of I-84 eastbound will be intermittently restricted to 17 feet 11 inches in height Sunday through Thursday nights between the hours of 8 PM & 5 AM. Friday nights between the hours of 8 PM & 8 AM. Saturday nights between the hours of 7 PM & 8:30 AM. Loads over 17 feet 11 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 30, 2023.
Last Updated
9/27/2023 7:00 PM

I-84: MP 5.87 to 5.51
I-84, 1 mile East of Portland, Intersection with 82nd Ave

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 5.6 to MP 6.35 (Portland) Effective August 8, 2023, this section of I-84 westbound will be restricted to 14 feet 00 inches in width at night, between the hours of 9 PM & 5 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 20, 2023.
Last Updated
9/27/2023 7:00 PM

I-84: MP 6.29
I-84, 1 mile West of Interstate 205

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 6.29 to MP 7.11 (Gresham) Effective September 29, 2023, this section of I-84 eastbound will be closed Sunday through Thursday nights between the hours of 10 PM & 5 AM, Friday nights between the hours of 10:30 PM & 6 AM, and Saturday nights between the hours of 10:30 PM & 6:30 AM. The estimated completion date for this work is October 2, 2023.
Last Updated
9/27/2023 7:00 PM

I-84: MP 6.74
I-84, Interstate 205

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 6.74 (Portland) Effective May 21, 2023, this section of I-84 westbound will be intermittently restricted to 15 feet 1 inch in height Sunday through Thursday nights between the hours of 8 PM & 5 AM. Friday nights between the hours of 8 PM & 8 AM. Saturday nights between the hours of 7 PM & 8:30 AM. Loads over 15 feet 1 inch in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 30, 2023.
Last Updated
9/27/2023 7:00 PM

I-84: WB MP 12.52 to 16.67
I-84, Gresham, Intersection with 181st Ave

Construction Work
No to Minimum Delay
Comments
Nighttime detour I-84 east at I-205 from 10 p.m. to 5 a.m. Sept. 29-Oct. 2. Use I-205 to detour. Nighttime closures of the I-84 east off ramp to 122nd. Daytime lane closures on NE 238th Avenue from 9 a.m. to 3 p.m. Nighttime lane closures between I-205 and Marine Drive (Exit 17) Monday through Friday. Lane closures allowed Sunday to Thursday nights from 8 p.m. to 5 a.m., Friday night from 8 p.m. to 8 a.m. Saturday, Saturday night from 7 p.m. to 8:30 a.m. Sunday. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
9/27/2023 2:55 PM

I-84: WB MP 13.03 to 10.08
I-84, Gresham, Intersection with 181st Ave

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane
Comments
Road maintenance operations have the WB right lane closed from 181st to 122nd Ave Ave. Prepare to slow or move over for worker safety.
Last Updated
9/27/2023 8:28 PM

I-84: MP 13.03 to 77

Snow Zone
Informational only
Affected Area
NE 181st in Troutdale east to just west of the Rowena Exit
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

I-84: MP 16.55
I-84, Troutdale

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 16.55 (Troutdale) Effective March 16, 2023, this section of I-84 westbound will be intermittently restricted to 16 feet 11 inches in height Monday through Thursday nights between the hours of 8 PM & 5 AM, Friday nights between the hours of 8:30 PM & 8 AM, Saturday nights between the hours of 8:30 PM & 8:30 AM, and Sunday nights between the hours of 9 PM & 5 AM. Loads over 16 feet 11 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 30, 2023.
Last Updated
9/27/2023 7:00 PM

I-84: MP 21.89
I-84, Corbett

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 20.00 to MP 22.00 (Corbett) Effective October 2, 2023, this section of I-84 westbound will be intermittently restricted to 13 feet 00 inches in width Monday through Friday between the hours of 6 AM & 8 PM. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 4, 2023.
Last Updated
9/27/2023 7:00 PM

I-84: WB MP 30.06
I-84, 1 mile West of Multnomah Falls

Construction Work
No to Minimum Delay
Comments
Eastbound right shoulder closed. Daytime single lane closures Monday through Wednesday, weather allowing. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
9/24/2023 9:16 AM

I-84: MP 30.47
I-84, 1 mile West of Multnomah Falls

Commercial Vehicle Information
Informational only
Details
I-84 EB & WB MP 29.50 to MP 30.50 (Dodson) Effective October 2, 2023, this section of I-84 eastbound and westbound will be intermittently restricted to 12 feet 6 inches in width Monday through Friday between the hours of 6 AM & 8 PM. Loads over 12 feet 6 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 4, 2023.
Last Updated
9/27/2023 7:00 PM

I-84: MP 35.14 to 35.23
I-84, 4 miles East of Multnomah Falls

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 34.12 to MP 35.32 (Cascade Locks) Effective October 30, 2023, this section of I-84 eastbound will be restricted to 12 feet 00 inches in width between the hours of 7 AM & 5 PM. The estimated completion date for this work is October 30, 2023.
Last Updated
9/27/2023 7:00 PM

I-84: MP 35.31 to 35.16
I-84, 4 miles East of Multnomah Falls

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 34.12 to MP 35.42 (Cascade Locks) Effective November 1, 2023, this section of I-84 westbound will be restricted to 15 feet 00 inches in width between the hours of 7 AM & 5 PM. The estimated completion date for this work is November 2, 2023.
Last Updated
9/27/2023 7:00 PM

I-84: MP 41.25 to 41.57
I-84, 4 miles West of Cascade Locks

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 40.55 to MP 41.75 (Cascade Locks) Effective October 30, 2023, this section of I-84 eastbound will be restricted to 17 feet 00 inches in width between the hours of 7 AM & 5 PM. The estimated completion date for this work is October 31, 2023.
Last Updated
9/27/2023 7:00 PM

I-84: MP 42.08 to 41.54
I-84, 3 miles West of Cascade Locks

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 41.22 to MP 42.72 (Cascade Locks) Effective November 1, 2023, this section of I-84 westbound will be restricted to 18 feet 00 inches in width between the hours of 7 AM & 5 PM. The estimated completion date for this work is November 2, 2023.
Last Updated
9/27/2023 7:00 PM

I-84: EB MP 58.39 to 59
I-84, 6 miles West of Hood River

Construction Work
Closure
Off Ramp
Comments
I-84 Exit 58 to Mitchell Point Overlook closed around-the-clock. Ramps Affected. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Last Updated
4/04/2023 2:15 PM

I-84: MP 63.02 to 63.72
I-84, Hood River

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 62.41 to MP 63.71 (Hood River) Effective October 31, 2023, this section of I-84 eastbound will be restricted to 13 feet 00 inches in width between the hours of 7 AM & 5 PM. The estimated completion date for this work is October 31, 2023.
Last Updated
9/27/2023 7:00 PM

I-84: MP 216 to 264

Snow Zone
Informational only
Affected Area
(Pendleton to La Grande) Cabbage Hill/Deadman Pass (Elev.3615') - Summit Blue Mountains (Elev. 4193')
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

I-84: MP 237.93 to 222.28
I-84, 21 miles West of La Grande

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 238.00 to MP 217.00 (Meacham) Effective July 17, 2023, this section of I-84 westbound will be intermittently restricted to 12 feet 00 inches in width Sunday through Thursday nights, half an hour after sunset to half an hour before sunrise. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 29, 2023.
Last Updated
9/27/2023 7:00 PM

I-84: MP 237.93 to 222.28
I-84, 21 miles West of La Grande

Commercial Vehicle Information
Informational only
Details
I-84 WB MP 238.00 to MP 217.00 (Meacham) Effective July 17, 2023, this section of I-84 westbound will be intermittently restricted to 17 feet 00 inches in width Sunday through Thursday during daylight hours only, half an hour before sunrise to half an hour after sunset. Loads over 17 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 29, 2023.
Last Updated
9/27/2023 7:00 PM

I-84: MP 266 to 281

Snow Zone
Informational only
Affected Area
Ladd Canyon - La Grande to North Powder
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

I-84: WB MP 271
I-84, 10 miles East of La Grande

Crash/Hazard
No to Minimum Delay
Comments
A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
9/27/2023 2:38 PM

I-84: EB MP 297.08 to 346.24
I-84, 8 miles West of Baker City

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
8/28/2023 9:09 AM

I-84: MP 300 to 328

Snow Zone
Informational only
Affected Area
Pleasant Valley - Baker City to Durkee
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

I-84: EB MP 309.5
I-84, 5 miles East of Baker City

Information
Unconfirmed
Comments
An unconfirmed report of a pedestrian in the roadway creating a hazard has been received. Use caution.
Last Updated
9/27/2023 7:18 PM

I-84: EB MP 343
I-84, Intersection with Old Oregon Trail Highway US30

Crash/Hazard
No to Minimum Delay
Comments
A rock fall has occurred causing minimal delay to traffic. Use caution.
Last Updated
9/05/2023 2:07 PM

I-84: MP 352 to 374

Snow Zone
Informational only
Affected Area
Farewell Bend to Ontario
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

I-84: WB MP 353.04 to 362.15
I-84, 7 miles East of Huntington

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Watch for single lane closures. Clear and grubbing and possibly embankment work for permanent crossovers in the median this week.
Last Updated
8/28/2023 9:33 AM

I-84: EB MP 359
I-84, 13 miles East of Huntington

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 3 Lanes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
8/28/2023 9:42 AM

I-84: MP 362.36 to 353.29
I-84, 15 miles West of Ontario

Commercial Vehicle Information
Informational only
Details
I-84 EB MP 353.20 to MP 368.16 (Ontario) Effective October 1, 2023, this section of I-84 eastbound will be restricted to 14 feet 00 inches in width at night between the hours of 9 PM & 6 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 2, 2023.
Last Updated
9/27/2023 7:00 PM

I-84: EB MP 368
I-84, 9 miles West of Ontario

Information
No to Minimum Delay
Lanes Affected
(Eastbound) , Shoulder
Comments
Highway erosion is causing minimal delay to traffic. Use caution.
Last Updated
9/09/2023 5:17 PM

US101: MP 0 to 3.3
US101, Oregon - Washington Border

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane
Comments
Bridge work is occurring. Prepare to slow.
Last Updated
9/25/2023 7:01 PM

US101: MP 0 to 3.33
US101, Oregon - Washington Border

Commercial Vehicle Information
Informational only
Details
US101 MP 0.00 to MP 3.33 (Astoria-Megler/Columbia River Bridge - Astoria) Effective September 19, 2021, US101 crossing the Astoria-Megler/Columbia River Bridge is restricted to the following weights for non-divisible loads: 21,500 lbs. single axle, 43,000 lbs. tandem axle, 204,800 lbs. GVW, other group axle weights shown in Weight Table 4; 24,000 lbs. single axle, 48,000 lbs. tandem axle, 174,400 GVW, other group axle weights shows in Weight Table 5 (requires minimum of 9 axles and 4 consecutive sets of tandem axles to qualify for Weight Table 5). The estimated completion date for this project is November 30, 2024.
Last Updated
9/27/2023 7:00 PM

US101: MP 2.68
US101, Astoria

Commercial Vehicle Information
Informational only
Details
US101 NB & SB MP 0.00 to MP 3.00 (Astoria-Megler Bridge-Astoria) On Sunday October 8, 2023, this section of US101 northbound and southbound (Astoria-Megler Bridge) will be closed between the hours of 8:30 AM & 11:00 AM, for one day only, for the Great Columbia Crossing 10K run/walk.
Last Updated
9/27/2023 7:00 PM

US101: MP 2.8 to 3.4
US101, Astoria

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Bridge work is occurring. Prepare to slow. During construction, plan for single lane traffic with flaggers and up to 20 minute delays. Work will be daily, Monday through Thursday, between 6 a.m. to 7 p.m. and Friday, between 6 a.m. to 5 p.m.
Last Updated
9/08/2023 7:22 AM

US101: MP 21 to 22
US101, Seaside

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=18733)
Last Updated
7/27/2023 6:33 AM

US101: MP 80.35 to 80.37
US101, 7 miles North of Cloverdale

Construction Work
Future Event: No to Minimum Delay
Expected Start Date
10/2/2023 10:00:00 AM
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
9/26/2023 10:06 AM

US101: MP 98.85 to 104.2

Snow Zone
Informational only
Affected Area
Cascade Head - just north of Neskowin Creek to just north of the Salmon River
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US101: MP 211.7 to 213.2
US101, Intersection with Umpqua Highway ORE38

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. In Reedsport, watch for daytime lane and shoulder closures along U.S. 101 north of Schofield Creek. In the southern part of Reedsport (U.S. 101 south of Schofield Creek) watch for on-street parking closures and bicycle lane closures. Watch for intermittent lane closures on Frontage Road.
Last Updated
6/20/2023 3:46 AM

US101: NB MP 239
US101, Coos Bay

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Most construction is complete, but ODOT will make adjustments to the large concrete island near the Mullen Road intersection to better accommodate truck traffic. Watch for nighttime construction. Motorists can expect intermittent shoulder and lane closures.
Last Updated
5/30/2023 12:00 AM

US101: MP 274
US101, Bandon

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Watch for intermittent lane and shoulder closures along U.S. 101 in the vicinity of the entrance to Old Town Bandon. Alternate routes will be identified for pedestrians during sidewalk construction
Last Updated
9/22/2023 3:05 PM

US101: MP 300 to 301
US101, Port Orford

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Watch for construction at the Jefferson Street and Madrona Avenue intersections of U.S. 101. This work will involve shoulder closures and intermittent flagging. At 12th Street (near Driftwood Elementary School), watch for lane shifts and flagging on U.S. 101.
Last Updated
8/27/2023 12:38 PM

US101: MP 304
US101, 4 miles South of Port Orford

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane
Comments
Hazardous debris is causing minimal delay to traffic. Use caution.
Last Updated
9/27/2023 8:59 PM

US101: MP 304.7
US101, 5 miles South of Port Orford

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect delays and watch for flaggers as needed, as well as construction vehicles entering and leaving the work zone south of Port Orford. All work is expected to be finished by August 1. This project is stabilizing the slope on the west side of the highway.
Last Updated
6/20/2023 3:28 AM

US101: MP 311.4
US101, 11 miles South of Port Orford

Commercial Vehicle Information
Informational only
Details
US101 MP 311.40 (Reinhart Creek Bridge - south of Port Orford) Effective March 1, 2017, US101 crossing the Reinhart Creek Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights may cross the bridge if they stop oncoming traffic and straddle the centerline. Certified flaggers are required to stop oncoming traffic.
Last Updated
9/27/2023 7:00 PM

US101: MP 312.1
US101, 12 miles South of Port Orford

Crash/Hazard
Estimated delay under 20 minutes
Comments
Sunken grade. Prepare to slow.
Last Updated
8/29/2023 8:27 AM

US101B: MP 0.5
ORE202, Astoria

Construction Work
Future Event: No to Minimum Delay
Expected Start Date
10/2/2023 8:00:00 AM
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
9/26/2023 8:15 AM

US101B: MP 7.1 to 6.74
US101B, Astoria

Information
No to Minimum Delay
Comments
A bridge lift is creating minimal delay to traffic. Use caution.
Last Updated
9/27/2023 9:03 PM

US197: MP 0.05 to 0.61
US197, Intersection with Columbia River Highway I-84

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work continues on the shoulders and staging areas off the ends of the bridge during daytime hours with no impacts to traffic, as well as on the bridge deck, sidewalks and under the bridge. Single lane closures controlled by flaggers will continue to occur during weeknights between the hours of 8 pm and 6 am when travelers should expect less than 20 minute delays during those nighttime, single lane closures. A speed reduction to 35 MPH is in place across thee bridge, Use caution when traveling through the project.
Last Updated
9/24/2023 8:51 AM

US199: MP 6.5 to 41.69
US199, 6 miles North of Wonder

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Chip seal projects can result in loose rock in the roadway. Motorists are advised to slow down, drive with caution and allow additional space between vehicles.
Last Updated
8/18/2023 9:28 AM

US199: MP 13.5 to 41.69

Snow Zone
Informational only
Affected Area
Illinois Valley - (Siss's Gap Summit Elev. 1457') - Hayes Hill to OR/CA State Border
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US199: SB MP 36 to 39
US199, O'Brien

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
9/27/2023 8:28 PM

US199: MP 41.68
US199, Oregon - California Border

Crash/Hazard
Closure
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Highway 199 will be closed in California between 8am and 11am and 1pm to 4pm Monday through Friday. Crews are working in areas affected by recent wildfires, from Patrick’s Creek to the Collier Tunnel (MP 19-33.5). The road will be open to one-way controlled traffic at all other times, including nights and weekends. Travelers should anticipate up to one-hour delays during all open hours. THIS SCHEDULE IS SUBJECT TO CHANGE. Check Caltrans QuickMap at https://quickmap.dot.ca.gov for updates before traveling.
Last Updated
9/27/2023 2:20 PM

US20: MP 2.9 to 4.3
US20, 2 miles East of Corvallis

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect lane closures and delays Su-Th nights 7PM-6AM for grinding and paving as weather allows. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21191)
Last Updated
9/21/2023 8:15 AM

US20: MP 10.99 to 10.63
US20, Intersection with Pacific Highway East ORE99E

Commercial Vehicle Information
Informational only
Details
US20 WB/OR99E SB MP 10.61 to MP 11.00 (Albany) On Saturday, November 11, 2023, this section of US20 westbound/OR99E southbound will be closed between the hours of 10 AM & 3 PM for the Veteran's Day Parade.
Last Updated
9/27/2023 7:00 PM

US20: MP 11.13
US20, 3 miles South of Intersection with Cloverdale Road

Crash/Hazard
Unconfirmed
Comments
An unconfirmed report of a crash has been received. Use caution.
Last Updated
9/27/2023 7:49 PM

US20: MP 14.31 to 17.43
US20, Tumalo

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Crews will be performing day and night lane closures on US20 from Tumalo to Cooley Rd Monday to Friday for roundabout and paving works. The new roundabouts at Old Bend Redmond and Tumalo are open for single lane traffic. In Tumalo, work includes 5th, 7th, 8th, Bruce, Bailey, Cook and O.B. Riley roads. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20011)
Last Updated
9/24/2023 9:34 AM

US20: MP 14.47 to 14.75
US20, Tumalo

Commercial Vehicle Information
Informational only
Details
US20 EB & WB MP 14.31 to MP 14.96 (Tumalo) Effective April 17, 2023, this section of US20 eastbound and westbound will be restricted to 17 feet 8 inches in height. The estimated completion date for this work is October 9, 2023.
Last Updated
9/27/2023 7:00 PM

US20: MP 17.3 to 18.3
US20, 1 mile North of Bend

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 2 Lanes , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Contractor will be performing shoulder grading, electrical, striping and roadside sign installation on US 20 from Cooley to Robal (US20 MP 17.4-18.1) Contractor will be performing sewer and water line installation on Nels Anderson just north of Brandis Ct under flagging closures for DP3.
Last Updated
9/24/2023 8:56 AM

US20: MP 26.64 to 30.35
US20, Intersection with Halsey - Sweet Home Highway ORE228

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes , Shoulder (Eastbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. During construction expect delays up to 20 minutes. Work is expected to occur Monday through Friday, between 7:00am to 5:00pm. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22391)
Last Updated
8/03/2023 2:10 PM

US20: MP 28.3 to 40.68

Snow Zone
Informational only
Affected Area
Cline Hill (Elev. 770') (near Austin Creek) to Dudlee Hill (Elev. 860') (near Blodgett)
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US20: WB MP 50.14 to 50.79
US20, Intersection with Alsea Highway ORE34

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Working complete elements of the ongoing Philomath Downtown Safety and Streetscape Project to improve livability and accessibility of the City's downtown area. Resurface the roadway to create a smoother driving surface. Expect minor delays. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21514)
Last Updated
8/31/2023 8:04 AM

US20: MP 52.5 to 88

Snow Zone
Informational only
Affected Area
Tombstone Pass Summit (Elev. 4236')/Santiam Pass Summit (Elev. 4817') - Fernview Campground (Upper Soda) to east of Suttle Lake Loop Rd (USFS 2070)
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US20: MP 88.2 to 91.75

Snow Zone
Informational only
Affected Area
Sisters - Jack Lake Rd to just west of Black Butte Ranch
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US20: MP 99.94
US20, Sisters

Commercial Vehicle Information
Informational only
Details
US20 MP 99.94 EB & WB (Sisters) Effective November 28, 2017, this section of US20 eastbound and westbound is restricted to 14 feet 00 inches in width and/or 154 feet 00 inches in overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet and/or 154 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
9/27/2023 7:00 PM

US20: MP 114.1 to 258.2
US20, Sage Hen Rest Area

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Contractor will be working within the 24 hour flagging zone to excavate portions of the existing roadway to reconstruct for concrete panels. 24 hour flagging will last for 1 more month for stage 3.
Last Updated
9/01/2023 9:28 PM

US20: MP 154.2 to 166.6

Snow Zone
Informational only
Affected Area
Stinkingwater Pass (Elev. 4848') - Just west of Buchanan to just west of Stinkingwater Creek Rd.
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US20: MP 171.08 to 223.16
US20, 2 miles West of Intersection with Drewsey Road

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
8/28/2023 9:01 AM

US20: MP 200 to 203
US20, 10 miles East of Juntura

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Westbound) , Shoulder (Eastbound) , Shoulder
Comments
A rock fall has occurred causing minimal delay to traffic. Use caution.
Last Updated
9/24/2023 11:35 AM

US26: MP 0.32 to 1.32
US26, I-405

Commercial Vehicle Information
Informational only
Details
US26 EB MP 0.32 to MP 1.32 (Ross Island Way - Portland) On Sunday October 1, 2023, this section of US26 eastbound will be closed between the hours of 6:00 AM and 2:30 PM for the Portland Marathon.
Last Updated
9/27/2023 7:00 PM

US26: WB MP 0.96 to 0.45
US26, 1 mile East of I-405

Maintenance Work
Estimated delay under 20 minutes
Comments
Road work has the WB right lane closed on the Ross Island Bridge. Prepare to slow or move over for worker safety.
Last Updated
9/27/2023 7:52 PM

US26: MP 1.27 to 3.43
US26, 1 mile East of Intersection with Oregon Coast Highway US101

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
9/25/2023 8:06 AM

US26: MP 5.85 to 9.96
US26, Portland

Construction Work
Informational only
Comments
Lane closures, traffic shifts, shoulder closures and up to 20-minute traffic holds weekdays from 8 a.m. to 5 p.m. and at night from 9 p.m. to 5 a.m.
Last Updated
7/16/2023 5:07 PM

US26: MP 9.72 to 35.11

Snow Zone
Informational only
Affected Area
David Douglas (Elev. 1642') - East of Necanicum Jct to Sand Shed near North Fork Wolf Creek Rd
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 25.12 to 42.5

Snow Zone
Informational only
Affected Area
Sandy to Zigzag
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 37.1 to 41.59
US26, 3 miles West of Welches

Construction Work
Estimated delay under 20 minutes
Comments
Nighttime single lane closures in both directions between the Salmon River and Lolo Pass Road 8 p.m. to 8 a.m. Saturday night through Friday morning. Periodic daytime shoulder closures. Periodic daytime lane closures 9 a.m. to 3 p.m. during the week on local roads. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21599)
Last Updated
9/18/2023 11:23 AM

US26: MP 37.26 to 41.59
US26, 3 miles West of Welches

Commercial Vehicle Information
Informational only
Details
US26 EB & WB MP 37.10 to MP 41.59 (Mount Hood Village) Effective August 1, 2023, this section of US26 eastbound and westbound will be restricted to 14 feet 00 inches in width, Sunday through Saturday nights between the hours of 8 PM and 8 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 14, 2023.
Last Updated
9/27/2023 7:00 PM

US26: MP 37.73 to 45.43

Snow Zone
Informational only
Affected Area
Sunset Summit (Elev. 1174') - Timber Jct to Nehalem Hwy
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 52.9 to 57.3

Snow Zone
Informational only
Affected Area
Ochoco Pass Summit WB (Elev. 4720') - Just west of the Ochoco National Forest Boundary to just west of Gage Creek Rd
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 59.57 to 75.5

Snow Zone
Informational only
Affected Area
Blue Box Pass (Elev. 4025') & Warm Springs Jct - OR35 Jct to Warm Springs Jct
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 66.43 to 112.91
US26, 9 miles South of Intersection with Mount Hood Highway ORE35

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. No work scheduled on-site for the coming week. Expected completion - mid Octoboer 2023.
Last Updated
9/24/2023 8:49 AM

US26: MP 147
US26, 7 miles North of Mount Vernon

Crash/Hazard
No to Minimum Delay
Comments
A vehicle fire has occurred causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
9/13/2023 7:38 AM

US26: MP 179.05 to 190.47

Snow Zone
Informational only
Affected Area
Dixie Summit (Elev. 5277') - just east of Dixie View Rd to just east of Davis Creek Rd
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 191.3 to 204.7

Snow Zone
Informational only
Affected Area
Blue Mountain Pass Summit - Austin (Elev, 5109') Just east of Jct. US26 OR7 to just east of FS 12
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 218.43 to 225.23

Snow Zone
Informational only
Affected Area
Eldorado Summit (Elev. 4623') - just east of Clear Creek Rd to east of the viewpoint
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US26: MP 231.12 to 253.84

Snow Zone
Informational only
Affected Area
Brogan Hill Summit (Elev. 3981') - Ironside to just east of Logan Rd
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US30: MP 1.51 to 4.93
US30, La Grande

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. The contractor will be working at multiple intersections along Main Street in Baker City for the next few weeks.
Last Updated
9/24/2023 9:49 AM

US30: MP 1.58 to 2.02
US30, La Grande

Commercial Vehicle Information
Informational only
Details
US30 EB & WB MP 1.57 to MP 2.02 (La Grande) On Saturday October 7, 2023 this section of US30 will be closed from Third St to Greenwood St between the hours of 10:00 AM & 4:30 PM for the Community Harvest Festival event.
Last Updated
9/27/2023 7:00 PM

US30: MP 1.58 to 2.1
US30, La Grande

Commercial Vehicle Information
Informational only
Details
US30 La Grande-Baker Hwy NB & SB MP 1.58 to MP 2.10 (La Grande) On Friday, October 13, 2023, US30 northbound and southbound between 3rd Street and Hemlock Street in La Grande will be closed between the hours of 4 PM & 5 PM for the Homecoming Parade.
Last Updated
9/27/2023 7:00 PM

US30: MP 3.94 to 6.51
US30, Portland

Construction Work
Estimated delay under 20 minutes
Comments
Periodic daytime and nighttime lane closures with flagging at Front and Bridge Avenues. Pedestrian impacts at some locations with temporary detours at intersection corners between NW Bridge Avenue and NW Kittridge Avenue. Bicycle use roadway travel lanes.
Last Updated
9/24/2023 9:19 AM

US30: MP 11.93
HWY100, 5 miles East of Corbett

Commercial Vehicle Information
Informational only
Details
US30 (Historic Columbia River Hwy) MP 11.93 (Latourell Creek Bridge - east of Corbett) Effective June 18, 2020, US30 (Historic Columbia River Hwy) crossing Latourell Creek Bridge at MP 11.93 is restricted to the following weights: 27 tons for SU5 (5 axle single-unit truck); 28 tons for SU6 & SU7 vehicles (6 and 7 axle single-unit trucks).
Last Updated
9/27/2023 7:00 PM

US30: MP 23.15
US30, 2 miles East of Warren

Commercial Vehicle Information
Informational only
Details
US30 MP 23.15 (Honeyman Creek Bridge - west of Scappoose) Effective June 9, 2020, US30 crossing the Honeyman Creek Bridge at MP 23.15 is restricted to 16 tons on the inside and center lanes. Loads exceeding 16 tons must use the right lane on the bridge when crossing.
Last Updated
9/27/2023 7:00 PM

US30: MP 28.56
US30, Saint Helens

Information
Future Event: Estimated delay under 20 minutes
Expected Start Date
10/7/2023 6:15:00 PM
Off Ramp
Comments
A special event is taking place. Prepare to slow. Ramps Affected.
Last Updated
9/01/2023 5:15 AM

US30: MP 48.31 to 61.01

Snow Zone
Informational only
Affected Area
Rainier to Clatskanie
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US30: MP 49.4
US30, 1 mile East of Hood River

Construction Work
No to Minimum Delay
Comments
Northbound and southbound right turn lanes closed on Rand Road at Cascade Avenue. Center left turn lane closed on Cascade Avenue. Pedestrian detours. Nighttime lane closures with flaggers directing traffic between 1 a.m. and 11 a.m. Wednesday through Friday nights as weather allows. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20519)
Last Updated
9/24/2023 9:20 AM

US30: MP 50.98 to 52.04
US30, Baker City

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. The contractor will be working at multiple intersections along Main Street in Baker City for the next few weeks.
Last Updated
9/24/2023 9:50 AM

US30: MP 51.29 to 52.69
US30, Baker City

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work will be focused on areas on and around Campbell, Broadway, and Main Streets. Work consists of demolition of existing sidewalks and ramps, preparation of base materials, curb/sidewalk/ramp construction, and installation of storm infrastructure for drainage. Paving activities should be occurring every Thursday. Please use caution and expect intermittent delays when traveling in these areas. Work in the downtown main street area will be very busy the next 3 weeks. Work begins at Baker Tower corner soon.
Last Updated
9/19/2023 6:50 AM

US30: MP 51.79 to 52.04
US30, Baker City

Commercial Vehicle Information
Informational only
Details
US30 NB & SB MP 51.79 to MP 52.04 (Baker City) On Saturday, October 7, 2023, this section of US30 northbound and southbound will be closed between the hours of 2 PM and 8 PM, for the Baker City taste of downtown Baker event.
Last Updated
9/27/2023 7:00 PM

US30: MP 61.61 to 61.47
US30, Intersection with Mist - Clatskanie Highway ORE47

Construction Work
Future Event: Estimated delay under 20 minutes
Expected Start Date
10/31/2023 8:00:00 AM
Lanes Affected
(Eastbound) 1 Lane (Westbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Work will be daily, Monday through Friday between 6am and 6pm.
Last Updated
9/27/2023 7:44 AM

US30: MP 63.71 to 66.72
US30, 2 miles West of Clatskanie

Commercial Vehicle Information
Informational only
Details
US30 WB MP 63.71 to MP 67.00 (Clatskanie) Effective July 17, 2023 this section of US30 westbound will be restricted to 17 feet 00 inches in width at all hours. The estimated completion date for this work is October 2, 2023.
Last Updated
9/27/2023 7:00 PM

US30: MP 65.15
US30, 3 miles West of Clatskanie

Commercial Vehicle Information
Informational only
Details
US30 EB MP 65.16 (Clatskanie) Effective July 10, 2023, this section of US30 eastbound will be closed at all hours. When closed, all traffic will be directed to take Colvin Rd. The detour is not approved for single trip permits. The estimated completion date for this work is October 2, 2023.
Last Updated
9/27/2023 7:00 PM

US30: MP 65.16
US30, 3 miles West of Clatskanie

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane (Westbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Work will occur daily 6am to 8pm. Starting July 7th, traffic going eastbound on U.S. 30 will use a detour onto Colvin Road. Westbound traffic will remain on U.S. 30. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20094)
Last Updated
9/05/2023 7:26 AM

US30: MP 72.32 to 76.76

Snow Zone
Informational only
Affected Area
Bradley Hill (Clatsop Crest Summit Elev. 655') - just east of Driscoll Slough Road to west of Shingle Mill Rd
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US30: EB MP 98.45 to 98.41
US30, Astoria

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 2 Lanes (Westbound) 2 Lanes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Work will be nightly, Sunday through Friday between 6pm and 7am. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=N00025)
Last Updated
9/05/2023 6:01 PM

US30BY: MP 0.4 to 0.6
US30BP, Intersection with Lower Columbia River Highway US30

Construction Work
No to Minimum Delay
Comments
Pedestrian detours. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=37899)
Last Updated
5/21/2023 4:12 PM

US30BY: MP 4.75 to 5.1
US30BP, Intersection with Pacific Highway I-5

Construction Work
No to Minimum Delay
Comments
Daytime lane closures on eastbound Lombard from Omaha to Lancaster Avenues Monday. Beginning Monday evening, around-the-clock lane closure on eastbound Lombard between Omaha and Mobile Avenues. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/R1ADACurbRamps.aspx)
Last Updated
9/24/2023 9:21 AM

US395: MP 10.27 to 18.27

Snow Zone
Informational only
Affected Area
Canyon Mountain (Elev. 5152') - north of South Vance Rd to just south of Swick Creek Rd
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US395: MP 33.6 to 42.5

Snow Zone
Informational only
Affected Area
Battle Mountain Summit (Elev. 4270') - Webb Slough to Corral Creek
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US395: MP 47.3 to 59.6

Snow Zone
Informational only
Affected Area
Devine Summit (Elev. 5340') - Just west of the Malheur National Forest to the east end of Devine Canyon
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US395: MP 55
US395, 34 miles North of Long Creek

Crash/Hazard
No to Minimum Delay
Comments
A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
9/27/2023 8:58 AM

US395: MP 65 to 82.9

Snow Zone
Informational only
Affected Area
Meadow Brook Summit (Elev. 4127') - Dale to Ritter Butte Summit (Elev. 3993')
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US395: MP 80
US395, 9 miles North of Long Creek

Crash/Hazard
No to Minimum Delay
Comments
A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
9/21/2023 7:03 AM

US395: MP 89
US395, Long Creek

Crash/Hazard
No to Minimum Delay
Comments
A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
9/27/2023 4:54 PM

US395: MP 89
US395, Long Creek

Crash/Hazard
No to Minimum Delay
Comments
A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
9/27/2023 6:39 PM

US395: MP 90.49 to 97.34

Snow Zone
Informational only
Affected Area
Long Creek - just south of 3rd St to north of Jack Vaughn Rd
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US395: MP 103 to 99
US395, 5 miles South of Fox

Construction Work
No to Minimum Delay
Comments
A chip seal project is occurring. Prepare to slow speed reduced to 35. Watch for workers. Watch for loose rock.
Last Updated
8/28/2023 11:11 AM

US730: MP 182.71 to 183.34
US730, Umatilla

Commercial Vehicle Information
Informational only
Details
US730 EB & WB MP 182.71 to MP 183.34 (Umatilla) On Friday October 27, 2023, this section of US730 eastbound and westbound, between "B" Street and "J" Street, will be closed, for one day only, between the hours of 4 PM and 7 PM for a downtown trick or treat event.
Last Updated
9/27/2023 7:00 PM

US86: MP 0 to 0.06
ORE86, Intersection with La Grande - Baker Highway US30

Commercial Vehicle Information
Informational only
Details
US30/OR86 EB & WB MP 0.00 to MP 0.06 (Baker City) On Saturday, October 7, 2023, this section of OR86 eastbound and westbound will be closed between the hours of 2 PM and 8 PM, for the Baker City's taste of downtown event.
Last Updated
9/27/2023 7:00 PM

US95: MP 0 to 9

Snow Zone
Informational only
Affected Area
Succor Creek (Elev. 4643') - OR/ID Border to Thomas Creek Rd (ODOT Stockpile Site)
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US95: MP 51.4 to 53.54

Snow Zone
Informational only
Affected Area
Rome Hill - north of Owyhee Rd to south of Rome Rd
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US95: MP 91.36 to 102.89

Snow Zone
Informational only
Affected Area
Blue Mountain Pass Summit (Elev. 5293') - just north of the ODOT Maintenance Station to south of the ODOT Stockpile Site
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US97: MP 73.4 to 67.7

Snow Zone
Informational only
Affected Area
Cow Canyon NB - Just south of jct with ORE293 to just south of Shaniko Junction
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US97: MP 97.5 to 101.5
US97, Intersection with Madras Prineville Highway US26

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Crews will be performing daytime shoulder closures on US97 Monday to Friday for intersection safety improvements. Paving is scheduled to occur Monday to Friday. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22520)
Last Updated
9/24/2023 9:32 AM

US97: MP 133.71 to 135.77
US97, 1 mile North of Bend

Commercial Vehicle Information
Informational only
Details
US97 NB & SB MP 133.50 to MP 135.90 (Bend) Effective August 15, 2023 this section of US97 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Friday nights between the hours of 8 PM & 6 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 25, 2023.
Last Updated
9/27/2023 7:00 PM

US97: MP 133.71 to 135.77
US97, 1 mile North of Bend

Commercial Vehicle Information
Informational only
Details
US97 SB MP 133.50 to MP 135.90 (Bend) Effective August 15, 2023 this section of US97 northbound and southbound will be intermittently restricted to 24 feet 00 inches in width at all hours. Loads over 24 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 25, 2023.
Last Updated
9/27/2023 7:00 PM

US97: MP 135
US97, Bend

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Contractor will be performing earthwork for the Empire/3rd ramps east of Nels Anderson and grading for the new Nels Anderson Rd west of current Nels Anderson. Contractor will be performing shoulder excavation and grading on the on SB US97 shoulder between Grandview and Cooley (MP 133.6-134.1) Contractor will be performing full reconstruction of Clausen intersection at US97.
Last Updated
9/24/2023 8:58 AM

US97: MP 146.1 to 155.5

Snow Zone
Informational only
Affected Area
Lava Butte SB - South of Bend ODOT Weight Station to Lambertiana & Vandevert Rd
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US97: MP 240.5 to 243.4

Snow Zone
Informational only
Affected Area
Chiloquin - Just south of Kirk Agency Rd FS #6210 to just north of Block Five Rd FS #9730 near Collier Memorial State Park
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

US97: MP 252.44 to 278.81
US97, 22 miles North of Klamath Falls

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 2 Lanes
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Bridge work on USBR Bridge at MP 273.71, Link River Bridge at MP 275.03, and the Green Spring Bridge at MP 277.12. USBR Bridge at MP 273.71: Bridge work will be done under the bridge, no delays expected. Link River Bridge at MP 275.03: Lane shift traffic control installed on Main Street, bridge work will be done behind the barrier, no delays expected. Conger Avenue is closed for thru traffic, detour in place. OR140 at the Green Springs Bridge: Lane shift traffic control installed, bridge work will be done behind the barrier, no delays expected.
Last Updated
6/12/2023 2:43 AM

ORE126: MP 0 to 13

Snow Zone
Informational only
Affected Area
Clearlake-Belknap Springs - US20 to OR242
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE126: MP 2.2 to 7.2
ORE126, Eugene

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Bridge construction is occurring at MP 6.8. Use caution and watch for workers. Night paving is occurring between Roosevelt and West 11th. Expect the paving between 9pm and 6am Wednesday and Thursday nights, and delays up to 20 minutes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21261)
Last Updated
6/22/2023 8:33 AM

ORE126: MP 15.84
ORE126, Prineville

Commercial Vehicle Information
Informational only
Details
OR126 EB & WB MP 15.84 (Prineville) Effective August 5, 2020, this section of OR126 eastbound and westbound is restricted to 16 feet 00 inches in width and/or 135 feet 00 inches in overall length. Mobile homes with eaves are allowed provided the base width does not exceed 16 feet 00 inches in width. Loads wider than 16 feet and/or 135 feet in overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
9/27/2023 7:00 PM

ORE126: MP 50.7 to 55.6

Snow Zone
Informational only
Affected Area
McKenzie Bridge - McKenzie Bridge to OR126 jct
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE126: MP 96.2
ORE126, 4 miles East of Sisters

Crash/Hazard
No to Minimum Delay
Comments
A hazardous materials cleanup is causing minimal delay to traffic. Use caution.
Last Updated
9/27/2023 2:17 PM

ORE138: MP 0 to 13
ORE138, Intersection with Umpqua Highway ORE38

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
7/27/2023 7:26 AM

ORE138: MP 16.7
ORE138, Glide

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes , Shoulder (Eastbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Watch for intermittent daytime lane and shoulder closures. Flaggers will provide traffic control as needed. Motorists should watch for construction vehicles entering and exiting the work area.
Last Updated
6/20/2023 4:30 AM

ORE138: MP 17.59 to 18.05
ORE138, 1 mile East of Glide

Commercial Vehicle Information
Informational only
Details
OR138 EB & WB MP 17.50 to MP 18.50 (Glide) Effective August 30, 2023, this section of OR138 eastbound and westbound will be restricted to 8 feet 6 inches in width at all hours. The estimated completion date for this work is November 3, 2023.
Last Updated
9/27/2023 7:00 PM

ORE138: MP 17.9
ORE138, 1 mile East of Glide

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Starting Wednesday, May 24, Oregon 38 will be limited to a single 14-foot lane. A temporary signal will provide traffic control day and night. Flaggers may provide daytime traffic control as needed.
Last Updated
6/20/2023 4:02 AM

ORE138: MP 18
ORE138, 1 mile East of Glide

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
9/05/2023 2:28 PM

ORE138: MP 22 to 38
ORE138, 5 miles East of Glide

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Remaining work zone activities include repairing and replacing delineators, signs, and damaged fencing. Work crews are responding to rock and debris slides in some areas. Watch for intermittent weekday lane closures from milepost 22 to 38. Expect delays up to 20 minutes. Flaggers and pilot cars will provide traffic control as needed.
Last Updated
6/12/2023 2:06 AM

ORE138: MP 58 to 100.82

Snow Zone
Informational only
Affected Area
North Umpqua - Toketee to US97 Intersection
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE138: MP 100.6
ORE138, Intersection with The Dalles - California Highway US97

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
7/27/2023 7:24 AM

ORE140: MP 1.03
ORE140, 1 mile East of Intersection with Crater Lake Highway ORE62

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
7/27/2023 7:42 AM

ORE140: MP 3.74 to 4.75
ORE140, Klamath Falls

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. No work expected next week.
Last Updated
6/20/2023 4:12 AM

ORE140: MP 21 to 45

Snow Zone
Informational only
Affected Area
Lake of the Woods (Elev. 5105') - Medford to Klamath Falls
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE140: MP 51 to 57

Snow Zone
Informational only
Affected Area
Doak Mountain Summit (Elev. 4776') - Near Denny Creek to just west of Aspen Lake Rd
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE140: MP 58
ORE140, 9 miles West of Klamath Falls

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
7/24/2023 7:48 AM

ORE140: MP 58.7
ORE140, 8 miles West of Klamath Falls

Commercial Vehicle Information
Informational only
Details
OR140 EB & WB MP 56.92 to MP 58.75 (Klamath Falls) Effective June 19, 2023, this section of OR140 eastbound and westbound will be restricted to 14 feet 00 inches in width Monday through Friday between the hours of 6 AM & 7 PM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is January 31, 2024.
Last Updated
9/27/2023 7:00 PM

ORE140: MP 58.7
ORE140, 8 miles West of Klamath Falls

Commercial Vehicle Information
Informational only
Details
OR140 EB & WB MP 56.92 to MP 58.75 (Klamath Falls) Effective June 19, 2023, this section of OR140 eastbound and westbound will be restricted to 16 feet 6 inches in height Monday through Friday between the hours of 6 AM & 7 PM. Loads over 16 feet 6 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is January 31, 2024.
Last Updated
9/27/2023 7:00 PM

ORE140: MP 68.5
ORE140, Intersection with Green Springs Highway ORE66

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
6/30/2023 2:33 PM

ORE153: MP 5.88
ORE153, Amity

Maintenance Work
Closure with Detour
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Bridge work has closed the road. Follow detour. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20445)
Last Updated
9/09/2023 4:34 PM

ORE153: MP 5.88
ORE153, Amity

Commercial Vehicle Information
Informational only
Details
OR153 (Bellevue-Hopewell Hwy) MP 5.88 (Salt Creek Bridge - west of Amity) Effective June 18, 2020, OR153 crossing Salt Creek (Ash Swale) Bridge at MP 5.88 is restricted to 9 tons for all vehicles.
Last Updated
9/27/2023 7:00 PM

ORE153: MP 5.88
ORE153, Amity

Commercial Vehicle Information
Informational only
Details
OR153 EB & WB MP 5.88 (Salt Creek Bridge - Amity) Effective May 31, 2022, this section of OR153 eastbound and westbound will be closed at all hours. The estimated completion date for this project is November 19, 2023.
Last Updated
9/27/2023 7:00 PM

ORE173: MP 0.12 to 5.49

Snow Zone
Informational only
Affected Area
Timberline - US26/Government Camp to Timberline Lodge
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE18: MP 12 to 18

Snow Zone
Informational only
Affected Area
Van Duzer Corridor - (Murphy Hill Summit Elev. 760') Just west of Bear Creek thru the Van Duzer Corridor
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE18: MP 40.44 to 50.1
ORE18, 7 miles West of McMinnville

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. We're resurfacing the pavement to repair cracking and improve smoothness of the road and making intersection safety improvements. Expect construction noise, lane and shoulder closures, with delays up to 20 minutes. Sunday Nights – Friday Morning: 7 p.m. - 5 a.m. Work zone controlled by flaggers. Bicyclists may be placed onto the roadway during times of active construction. Bicyclists may be placed onto the roadway during times of active construction. Shoulder/Lane Closures may also be in place for access to work areas around Norton Rd. and Cumulus Ave. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21548)
Last Updated
8/30/2023 8:37 PM

ORE18: MP 45.88 to 48.59
ORE18, McMinnville

Commercial Vehicle Information
Informational only
Details
OR18 EB & WB MP 45.80 to MP 48.59 (McMinnville) Effective July 31, 2023, this section of OR18 eastbound and westbound will be intermittently closed Sunday through Thursday nights between the hours of 7 PM & 5 AM. The estimated completion date for this work is September 30, 2023.
Last Updated
9/27/2023 7:00 PM

ORE18: MP 48.59
ORE18, 2 miles East of McMinnville

Maintenance Work
No to Minimum Delay
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
9/22/2023 2:50 PM

ORE19: MP 25
ORE19, 13 miles North of Condon

Crash/Hazard
No to Minimum Delay
Comments
A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
9/27/2023 5:49 PM

ORE202: MP 19.04 to 23.03

Snow Zone
Informational only
Affected Area
Nehalem - (Tidewater Summit Elev. 1221') Copperage Road (FS) to Swede Road (FS)
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE204: MP 0.4 to 10.58

Snow Zone
Informational only
Affected Area
Weston Mountain (Elev. 3200') - Intersection with OR11 to Tollgate
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE204: MP 10.59 to 39.45

Snow Zone
Informational only
Affected Area
Blue Mountain Summit (Elev. 5158') - Tollgate to Elgin
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE205: MP 7.22 to 73.35
ORE205, 7 miles South of Intersection with Steens Highway ORE78

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Chip sealing and other misc work between MP 73.35 and 40.69. Bridge work at MP 7.
Last Updated
8/28/2023 9:11 AM

ORE205: MP 58.25 to 60.5

Snow Zone
Informational only
Affected Area
"P" Hill Summit (Elev. 4822') - just north of Fish Lake Rd to just east of the summit
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE207: MP 4.3 to 36

Snow Zone
Informational only
Affected Area
Heppner-Spray Mountain (Elev. 4612')
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE207: MP 8.4 to 8.7
ORE207, Hermiston

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
8/28/2023 11:06 AM

ORE213: MP 7.23 to 7.41
ORE213, Portland

Construction Work
Future Event: Informational only
Expected Start Date
10/2/2023 8:00:00 AM
Comments
Expect daytime and nighttime lane closures on SE 82nd Avenue, with at least one lane open in each direction at a time. Project Description: We are repaving and making safety improvements on SE 82nd Avenue from SE Foster Road to SE Thompson Road. We will repave SE 82nd Avenue in both directions between SE Foster Road and SE Lindy Street. Pedestrian safety improvements from SE Foster to SE Thompson Road include four new Rectangular Rapid Flashing Beacons (RRFBs), upgrades to curb ramps that meet Americans with Disabilities Act (ADA) requirements and adding new sidewalks between SE Clatsop Street and SE Cornwell Street. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21177)
Last Updated
9/27/2023 1:58 PM

ORE213: MP 7.25 to 8.41
ORE213, Portland

Commercial Vehicle Information
Informational only
Details
OR213 NB & SB MP 7.25 to MP 8.45 (Portland) Effective January 31, 2024, this section of OR213 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is July 18, 2024.
Last Updated
9/27/2023 7:00 PM

ORE213: MP 7.25 to 8.41
ORE213, Portland

Commercial Vehicle Information
Informational only
Details
OR213 NB & SB MP 7.25 to MP 8.45 (Portland) Effective October 25, 2023, this section of OR213 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 29, 2023.
Last Updated
9/27/2023 7:00 PM

ORE213: MP 7.25 to 8.41
ORE213, Portland

Commercial Vehicle Information
Informational only
Details
OR213 NB & SB MP 7.25 to MP 8.45 (Portland) Effective December 13, 2023, this section of OR213 northbound and southbound will be intermittently restricted to 10 feet 00 inches in width at night between the hours of 7 PM & 7 AM. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is February 16, 2024.
Last Updated
9/27/2023 7:00 PM

ORE213: MP 15.7
ORE213, Intersection with Woodburn - Estacada Highway ORE211

Construction Work
Estimated delay under 20 minutes
Comments
Daytime shoulder closures along Toliver Road and OR 213. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20478)
Last Updated
8/27/2023 1:12 PM

ORE213: MP 28.2
ORE213, 1 mile North of Silverton

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Southbound) 1 Lane
Comments
An animal that has been struck is creating a hazard. Prepare to slow.
Last Updated
9/27/2023 8:39 PM

ORE217: MP 0.04
ORE217, US 26

Commercial Vehicle Information
Informational only
Details
OR217 NB off-ramp to Barnes Rd (Beaverton) Effective October 9, 2023, the OR217 northbound off-ramp to Barnes Road will be restricted to 18 feet 00 inches in width at night between the hours of 9 PM & 5 AM. Loads over 18 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 11, 2023.
Last Updated
9/27/2023 7:00 PM

ORE217: SB MP 2 to 6
ORE217, 2 miles South of US 26

Construction Work
Estimated delay of 20 minutes - 2 hours
Comments
Periodic nighttime lane closures on OR 217 in both directions Sunday, Sept. 24 through Friday. Nighttime rolling slowdowns in both directions from 11 p.m. to 5 a.m. Thursday for utility work. Ongoing closures: One westbound lane on the Hall Boulevard overpass is closed between Scholls Ferry Road and Cascade Avenue until Thanksgiving. The OR 217 southbound Denney Road on-ramp is closed until October 2023. The left turn lane on the Greenburg Road northbound off-ramp is closed for several months. Left turns permitted from the middle lane. Auxiliary lane closures on OR 217 south from Scholls Ferry Road to OR 99W and from OR 99W to 72nd Avenue. Expect shoulder closures on OR 217, various on- and off-ramps, and on local roads near the highway ramps. Various on- and off-ramps temporarily narrowed. Pedestrian detours on the Denny Road overpass, Hall Boulevard overpass in Beaverton, and at the end of the OR 99W southbound off-ramp. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/OR217/Pages/default.aspx)
Last Updated
9/24/2023 9:23 AM

ORE217: MP 2.26 to 2.7
ORE217, 2 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB Exit 2B on- and off-ramps to/from Allen Blvd (Beaverton) Effective January 1, 2022, the OR217 southbound Exit 2B on- and off-ramps to/from Allen Boulevard will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 28, 2023.
Last Updated
9/27/2023 7:00 PM

ORE217: SB MP 2.85 to 3.19
ORE217, 3 miles South of US 26

Construction Work
Closure
Off Ramp
Comments
Road work has the OR 217 southbound Denney Road off-ramp and on-ramp closed for approximately five months. Use an alternate route. Ramps Affected.
Last Updated
5/02/2023 5:00 AM

ORE217: MP 3.56
ORE217, 4 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB Exit 4A off-ramp to Hall Blvd (Beaverton) Effective January 24, 2022, the OR217 southbound Exit 4A off-ramp to Hall Boulevard will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 1, 2023.
Last Updated
9/27/2023 7:00 PM

ORE217: MP 3.83
ORE217, 4 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB on-ramp from Hall Blvd (Beaverton) Effective January 19, 2022, the OR217 southbound on-ramp from Hall Boulevard will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 1, 2023.
Last Updated
9/27/2023 7:00 PM

ORE217: MP 4.12 to 4.51
ORE217, 4 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB Exit 4B on- and off-ramps to/from OR210/Scholls Ferry Rd (Beaverton) Effective January 19, 2022, the OR217 southbound Exit 4B on- and off-ramps to/from OR210/Scholls Ferry Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 1, 2023.
Last Updated
9/27/2023 7:00 PM

ORE217: MP 4.741
ORE217, 5 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 NB Exit 5 on-ramp from Greenburg Rd (Tigard) Effective August 15, 2023, the OR217 northbound Exit 5 on-ramp from Greenburg Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 30, 2023.
Last Updated
9/27/2023 7:00 PM

ORE217: MP 4.78 to 5.17
ORE217, 5 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB on-ramp from Greenburg Rd (Beaverton) Effective January 26, 2022, the OR217 southbound on-ramp from Greenburg Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 1, 2023.
Last Updated
9/27/2023 7:00 PM

ORE217: MP 5.13
ORE217, 5 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 NB Exit 5 off-ramp to Greenburg Rd (Tigard) Effective November 4, 2022, the OR217 northbound Exit 5 off-ramp to Greenburg Road will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this work is August 31, 2023.
Last Updated
9/27/2023 7:00 PM

ORE217: MP 5.69
ORE217, 6 miles South of US 26

Commercial Vehicle Information
Informational only
Details
OR217 SB Exit 6 off-ramp to OR99W (Tigard) Effective November 4, 2022, the OR217 southbound Exit 6 off-ramp to OR99W will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this work is November 30, 2023.
Last Updated
9/27/2023 7:00 PM

ORE22: MP 32 to 73

Snow Zone
Informational only
Affected Area
Gates City Limit to Marion Forks
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE224: MP 49.911
ORE224, Ripplebrook Ranger Station

Commercial Vehicle Information
Informational only
Details
OR224 MP 49.91 (Clackamas River Bridge - Ripplebrook) Effective October 28, 2019, OR224 crossing Clackamas River Bridge at MP 49.91 is restricted to the following weights: 28 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
Last Updated
9/27/2023 7:00 PM

ORE228: MP 20.59 to 21.38
ORE228, Intersection with Santiam Highway US20

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers. During construction expect delays up to 20 minutes. Work is expected to occur Monday through Friday, between 7:00am to 5:00pm. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22391)
Last Updated
8/03/2023 2:10 PM

ORE230: MP 0 to 23.8

Snow Zone
Informational only
Affected Area
West Diamond Lake - OR62 to OR138
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE234: MP 15.81
ORE234, 2 miles West of Intersection with Crater Lake Highway ORE62

Commercial Vehicle Information
Informational only
Details
OR234 EB & WB MP 15.50 to MP 16.50 (Rogue River Bridge - Gold Hill) Effective August 7, 2023, this section of OR234 eastbound and westbound will be restricted to 12 feet 00 inches in width at all hours. The estimated completion date for this work is November 3, 2023.
Last Updated
9/27/2023 7:00 PM

ORE234: MP 16
ORE234, 1 mile West of Intersection with Crater Lake Highway ORE62

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Watch for single-lane traffic control by flaggers, Monday-Saturday, 7 a.m. to 3 p.m., for bridge maintenance and painting. This is part of a $5.8 million two-bridge project that will also repair the Lone Rock Bridge on Oregon 138E in Glide.
Last Updated
6/12/2023 2:08 AM

ORE238: MP 37.4
ORE238, 1 mile West of Medford

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Oregon 238 Rossanley Drive at Cheshire, City of Medford contractor can build a mountable roundabout, an access for the Rogue X recreational park currently under construction. Contact, Kristina Johnsen with the City of Medford at 541-774-2087. The roundabout has been paved.Temporary signs are being made or acquired, with temporary striping placed. Traffic is being detoured using North Ross Lane and West Main Streets.
Last Updated
6/12/2023 2:07 AM

ORE27: MP 27.23
ORE27, 15 miles North of Intersection with Central Oregon Highway US20

Commercial Vehicle Information
Informational only
Details
OR27 MP 27.23 (Bear Creek Bridge - south of Prineville) Effective May 27, 2021, OR27 crossing Bear Creek Bridge is restricted to the following weights: 34 tons for SU6 vehicles (6 axle single-unit trucks); 35 tons for SU7 (7 axle single-unit trucks).
Last Updated
9/27/2023 7:00 PM

ORE281: MP 2.2 to 2.3
ORE281, 1 mile South of Hood River

Construction Work
Closure with Detour
Comments
Single lane closures on OR 281 at Orchard Road 8 a.m. to 3:30 p.m. Monday through Friday. Flaggers directing traffic as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21537)
Last Updated
9/10/2023 12:45 PM

ORE31: MP 27 to 29

Snow Zone
Informational only
Affected Area
Horse Ranch - Just north of Fort Rock Jct
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE31: MP 60.6 to 66.2

Snow Zone
Informational only
Affected Area
Picture Rock Pass SB (Elev. 4830') - Just west of Weaver Rd to Just east of Summer Lake
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE34: EB MP 0.12
ORE34, Intersection with Pacific Highway West ORE99W

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing minimal delay to traffic. Use caution. Van Buren Bridge will be closed nightly from 7 p.m. to 6 a.m. for repairs. Eastbound traffic will be detoured onto the Harrison Bridge and back to Hwy 34 Eastbound. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20688&utm_campaign=vbb-construction&utm_source=ooh&utm_medium=referral)
Last Updated
8/11/2023 5:23 AM

ORE34: MP 45.59 to 53.08

Snow Zone
Informational only
Affected Area
Alsea Summit (Elev. 1230') - Cabin Creek Road to Botkin Road (5 miles south of Philomath)
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE35: MP 60 to 83.56

Snow Zone
Informational only
Affected Area
White River - Jct US26 to ODOT Maintenance Station
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE36: MP 4.68
ORE36, 3 miles West of Swisshome

Commercial Vehicle Information
Informational only
Details
OR36 EB & WB MP 5.60 to MP 5.80 (Mapleton) Effective June 5, 2023, this section of OR36 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 31, 2023.
Last Updated
9/27/2023 7:00 PM

ORE36: MP 5.68
ORE36, 2 miles West of Swisshome

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane
Comments
Bridge work is occurring. Prepare to slow. Temporary signal directing one way traffic around bridge construction. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22433)
Last Updated
9/13/2023 11:52 AM

ORE38: MP 16
ORE38, 16 miles East of Intersection with Oregon Coast Highway US101

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. A short section of Main Street will remain closed under Scottsburg Bridge until next spring. Hamilton Construction will resume work rebuilding the road when weather improves. Scottsburg West Road motorists are advised to use Oregon 38 to reach other areas of Scottsburg.
Last Updated
8/28/2023 6:48 AM

ORE38: MP 35 to 36
ORE38, 1 mile West of Elkton

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. This project will improve safety for pedestrians by bringing several highway curb ramps along Oregon 38 in Elkton into compliance with the Americans with Disabilities Act. The project also will replace ADA sidewalk ramps in Bandon, Gardiner, Reedsport and Drain. Watch for intermittent lane and shoulder closures along Oregon 38 through Elkton due to sidewalk construction.
Last Updated
6/20/2023 4:02 AM

ORE38: MP 45
ORE38, 6 miles West of Drain

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
6/20/2023 4:25 AM

ORE38: MP 50 to 51
ORE38, Drain

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
7/27/2023 6:20 AM

ORE42: MP 31
ORE42, 6 miles West of Remote

Crash/Hazard
No to Minimum Delay
Comments
High water is causing minimal delay to traffic. Use caution.
Last Updated
9/25/2023 2:00 PM

ORE42: MP 35.44 to 35.59
ORE42, 2 miles West of Remote

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Highway traffic has been routed onto a bypass alignment. Watch for a traffic signal at the work zone and expect brief delays.
Last Updated
8/27/2023 12:24 PM

ORE42: MP 63 to 72
ORE42, 1 mile West of Tenmile

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes , Shoulder (Eastbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Chip seal projects can result in loose rock in the roadway. Motorists are advised to slow down, drive with caution and allow additional space between vehicles.
Last Updated
8/18/2023 9:26 AM

ORE43: MP 0 to 2.54
ORE43, Intersection with Mount Hood Highway US26

Commercial Vehicle Information
Informational only
Details
OR43 SB MP 0.00 to MP 2.71 (Portland) On Sunday October 1, 2023, this section of OR43 southbound will be closed between the hours of 6:00 AM and 2:30 PM, for the Portland Marathon.
Last Updated
9/27/2023 7:00 PM

ORE46: MP 15.8 to 19.33
ORE46, 3 miles West of Oregon Caves National Monument

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
7/27/2023 7:47 AM

ORE47: MP 0 to 11.71

Snow Zone
Informational only
Affected Area
OR202 Jct - (Clatskanie Mountain Summit Elev. 1347') Clatskanie to Mist
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE47: MP 52.33 to 53.08
ORE47, 6 miles South of Messing Creek Bridge

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
9/24/2023 10:34 AM

ORE47: MP 62.32 to 62.36
ORE47, 2 miles South of Vernonia

Maintenance Work
Future Event: No to Minimum Delay
Expected Start Date
9/28/2023 8:00:00 AM
Comments
Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety.
Last Updated
9/26/2023 2:44 PM

ORE47: MP 88.05
ORE47, 1 mile North of Forest Grove

Commercial Vehicle Information
Informational only
Details
OR47 MP 88.05 NB & SB (Forest Grove) Effective September 27, 2016, this section of OR47 northbound and southbound is restricted to 14 feet 00 inches in width and/or 135 feet 00 inches in overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet and/or 135 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
Last Updated
9/27/2023 7:00 PM

ORE53: MP 17.76
ORE53, 1 mile North of Intersection with Oregon Coast Highway US101

Commercial Vehicle Information
Informational only
Details
OR53 MP 17.76 NB & SB (Nehalem River Bridge - Nehalem) Effective May 27, 2021, OR53 crossing Nehalem River Bridge is restricted to 20,000 single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for combinations; 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
9/27/2023 7:00 PM

ORE569: EB MP 6.83 to 7
ORE569, Intersection with Pacific Highway West ORE99W

Construction Work
No to Minimum Delay
Off Ramp
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Ramps Affected. Ramps Affected. The eastbound Beltline highway on-ramp from Prairie Rd and the eastbound Beltline highway exit 7 ramp onto the Northwest Expressway are closed for bridge rail replacement. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20116)
Last Updated
9/01/2023 5:18 AM

ORE58: MP 13.19 to 82.47
ORE58, 9 miles East of Pleasant Hill

Commercial Vehicle Information
Informational only
Details
OR58 EB & WB MP 13.07 to MP 84.97 (Oakridge) Effective April 3, 2023, this section of OR58 eastbound and westbound will be intermittently restricted to 14 feet 00 inches in width Monday through Friday between the hours of 6 AM & 7 PM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 9, 2023.
Last Updated
9/27/2023 7:00 PM

ORE58: MP 42 to 55
ORE58, 3 miles West of McCredie Springs

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Expect single lane closures 6AM- 7PM Mon-Fri for culvert work. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20102)
Last Updated
9/15/2023 7:09 AM

ORE58: MP 48.7 to 69.52

Snow Zone
Informational only
Affected Area
Willamette Pass Summit (Elev. 5128') - East of McCreadie Springs to Odell Lake
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE58: MP 77.42 to 70

Snow Zone
Informational only
Affected Area
Willamette Pass East EB - Odell Butte to Crescent Lake Jct
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE6: MP 5.47 to 8.55
ORE6, 5 miles East of Tillamook

Information
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder
Comments
Utility work is occurring. Prepare to slow. Utility work will be occurring Monday through Thursday 8am to 4pm.
Last Updated
7/31/2023 4:16 PM

ORE6: MP 16.06 to 37.5

Snow Zone
Informational only
Affected Area
Wilson River Summit (Elev. 1610') - Jordan Creek to Timber Jct.
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE6: MP 40 to 33
ORE6, 1 mile East of Glenwood

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
9/26/2023 3:41 PM

ORE62: MP 19.5 to 20
ORE62, Shady Cove

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
9/24/2023 10:27 AM

ORE62: MP 44 to 55

Snow Zone
Informational only
Affected Area
Just east of the Rogue River to Union Creek
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE66: MP 0.73
ORE66, Intersection with Pacific Highway I-5

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
7/27/2023 7:39 AM

ORE66: MP 0.73 to 0.76
ORE66, Intersection with Pacific Highway I-5

Commercial Vehicle Information
Informational only
Details
OR66 EB & WB MP 0.70 to MP 0.80 (Ashland) Effective September 14, 2023, this section of OR66 eastbound and westbound will be restricted to 12 feet 00 inches in width at all hours. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 13, 2023.
Last Updated
9/27/2023 7:00 PM

ORE66: MP 9 to 41

Snow Zone
Informational only
Affected Area
Green Springs Summit (Elev. 4551'), Parker Mountain Pass (Elev. 4656'), and Hayden Mountain Summit (Elev. 4695') - Ashland to Keno
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE7: MP 0 to 1.26
ORE86, Intersection with La Grande - Baker Highway US30

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work will be focused on areas on and around Campbell, Broadway, and Main Streets. Work consists of demolition of existing sidewalks and ramps, preparation of base materials, curb/sidewalk/ramp construction, and installation of storm infrastructure for drainage. Paving activities should be occurring every Thursday. Please use caution and expect intermittent delays when traveling in these areas. Work in the downtown main street area will be very busy the next 3 weeks. Work begins at Baker Tower corner soon.
Last Updated
9/19/2023 6:50 AM

ORE7: MP 0.07 to 25

Snow Zone
Informational only
Affected Area
Tipton Summit (Elev. 5124') and Larch Summit (Elev. 5082') - Near the jct with US26 to the jct of ORE410
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE7: MP 0.24 to 0.61
ORE86, Intersection with La Grande - Baker Highway US30

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. The contractor will be working at multiple intersections along Main Street in Baker City for the next few weeks.
Last Updated
9/24/2023 9:50 AM

ORE7: MP 35 to 33

Snow Zone
Informational only
Affected Area
Mason Dam Hill SB - Whitman National Forest to west of Hwy 245 Jct
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE7: MP 50.37 to 50.96
ORE7, Baker City

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work will be focused on areas on and around Campbell, Broadway, and Main Streets. Work consists of demolition of existing sidewalks and ramps, preparation of base materials, curb/sidewalk/ramp construction, and installation of storm infrastructure for drainage. Paving activities should be occurring every Thursday. Please use caution and expect intermittent delays when traveling in these areas. Work in the downtown main street area will be very busy the next 3 weeks. Work begins at Baker Tower corner soon.
Last Updated
9/19/2023 6:50 AM

ORE78: MP 54.69 to 66.17

Snow Zone
Informational only
Affected Area
Folly Farm (Elev. 5087') - south of Malheur Caves Rd to south of Crowley-Riverside Rd
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.

ORE8: MP 2.65 to 3.6
ORE8, Highway 217

Commercial Vehicle Information
Informational only
Details
OR8 EB & WB MP 2.67 to MP 3.60 (Beaverton) Effective August 15, 2022, this section of OR8 (Tualatin Valley Highway) will be restricted to 10 feet 00 inches in width Monday through Friday nights between the hours of 8:00 PM and 5:00 AM. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 29, 2023.
Last Updated
9/27/2023 7:00 PM

ORE8: MP 2.81 to 7
ORE8, Highway 217

Construction Work
No to Minimum Delay
Comments
Nighttime lane closures from 8 p.m. to 5:30 a.m. in both directions on OR 8 and side streets. Nighttime lane closures at SW Hall Boulevard, SW 110th, SW Watson Avenue and SW Short Street. Daytime lane closures at SW 192nd Avenue, westbound OR 8 from 8 a.m. to 2 p.m.
Last Updated
9/17/2023 1:58 PM

ORE82: MP 0.22 to 2.41
ORE82, Intersection with Old Oregon Trail Highway I-84

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. The contractor will be working at multiple intersections along Main Street in Baker City for the next few weeks.
Last Updated
9/24/2023 9:50 AM

ORE82: MP 45.6 to 46.1
ORE82, Wallowa

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Continue to work on embankment and aggregate base. Installing guardrail and temporary barrier for Stage IV traffic switch. OR82 under single lane signal controlled traffic pattern through Oct. Delays up to 20 minutes can be expected.
Last Updated
9/24/2023 9:49 AM

ORE82: MP 46.78 to 47.58
ORE82, Wallowa

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect intermittent flagging closures and/or pedestrian detours at these locations, and exercise caution while passing through the work zone.
Last Updated
9/19/2023 6:48 AM

ORE82: MP 54.69 to 55.05
ORE82, Lostine

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Expect intermittent flagging closures and/or pedestrian detours at these locations, and exercise caution while passing through the work zone.
Last Updated
9/19/2023 6:48 AM

ORE86: MP 40.64
ORE86, Richland

Commercial Vehicle Information
Informational only
Details
OR86 MP 40.64 (Eagle Creek Bridge - Richland) Effective October 20, 2016, all single-trip permit holders over continuous trip permit weights must stop all traffic, straddle centerline, and be the only vehicle on bridge when crossing.
Last Updated
9/27/2023 7:00 PM

ORE99: SB MP -2.16
US199, Grants Pass

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road maintenance operations are occurring. Prepare to slow or move over for worker safety.
Last Updated
9/27/2023 9:12 AM

ORE99: MP -0.36
ORE99W, Portland

Commercial Vehicle Information
Informational only
Details
OR99W MP -0.36 (Steel Bridge - Portland) Effective October 28, 2019, OR99W crossing the Steel Bridge in Portland is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 2 & for Non-Divisible Loads 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3.
Last Updated
9/27/2023 7:00 PM

ORE99: MP 0.13
ORE99, Intersection with Pacific Highway I-5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) , Shoulder (Southbound) , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers. Crews will replace ADA curb ramps and gutters in downtown Ashland through the end of spring. Weather permitting, watch for construction at the following locations: Temporary pedestrian access will be maintained. Construction hours are 7 a.m. to 3 p.m. Expect possible short delays of up to 20 minutes.
Last Updated
6/12/2023 2:10 AM

ORE99: MP 0.4 to 1.6
ORE99, Intersection with Pacific Highway I-5

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Watch for single-lane closures and watch for construction workers and equipment. Because of delays by the railroad contractor, the traffic signals will not be turned on until the new railroad signals are operational, which could be later this summer. Until then, traffic control will be provided by a stop sign. The work zone speed limit has been reduced to 45 mph for worker safety.
Last Updated
6/20/2023 4:05 AM

ORE99: MP 1.31 to 1.43
ORE99W, I-405 South Interchange

Commercial Vehicle Information
Informational only
Details
OR99W/Naito Pkwy SB MP 1.31 to MP 1.43 (Portland) On Sunday October 1, 2023, this section of OR99W/Naito Parkway southbound will be closed between the hours of 6:00 AM and 2:30 PM for the Portland Marathon.
Last Updated
9/27/2023 7:00 PM

ORE99: MP 1.41
ORE99W, I-405 South Interchange

Commercial Vehicle Information
Informational only
Details
OR99W (Pacific Hwy) MP 1.41 (Arthur Street Bridge - Portland) OR99W crossing Arthur Street Bridge at MP 1.41 is restricted to the following weights: 33 tons for SU6 (6 axle single-unit trucks); and 34 tons for SU7 (7 axle single-unit trucks).
Last Updated
9/27/2023 7:00 PM

ORE99: MP 2.17 to 2.42
ORE99E, Intersection with Albany - Corvallis Highway US20

Commercial Vehicle Information
Informational only
Details
OR99E SB/US20 WB MP 2.17 to MP 2.42 (Albany) On Saturday, November 11, 2023, this section of OR99E southbound/US20 westbound will be closed between the hours of 10 AM & 3 PM for the Veteran's Day Parade.
Last Updated
9/27/2023 7:00 PM

ORE99: MP 3.7 to 1.47
ORE99E, Portland

Commercial Vehicle Information
Informational only
Details
OR99E NB MP 1.47 to MP 3.72 (Portland) On Sunday October 1, 2023, this section of OR99E will be restricted to 18 feet 00 inches in width between the hours of 6:00 AM and 2:30 PM, for the Portland Marathon.
Last Updated
9/27/2023 7:00 PM

ORE99: MP 10.2 to 11
ORE99, 1 mile North of Phoenix

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
6/20/2023 3:31 AM

ORE99: MP 11.81
ORE99E, Oregon City

Commercial Vehicle Information
Informational only
Details
OR99E off-ramp to I-205 NB (Oregon City) Effective September 30, 2023, the OR99E off-ramp to I-205 northbound will be restricted to 18 feet 00 inches in width at all hours. Loads over 18 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is March 1, 2024.
Last Updated
9/27/2023 7:00 PM

ORE99: MP 14.33
ORE99, Cottage Grove

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Cottage Grove Urban Upgrade Project. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20242)
Last Updated
9/23/2023 6:16 AM

ORE99: MP 14.39
ORE99, Talent

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
7/20/2023 11:34 AM

ORE99: MP 14.39
ORE99, Talent

Commercial Vehicle Information
Informational only
Details
OR99 MP 14.39 (Wagner Creek Bridge - Talent) Effective September 29, 2022, OR99 crossing Wagner Creek Bridge is restricted to the following weights: 21 tons for Type 3 Vehicles (3 axle single-unit trucks); 19 tons SU4 (4 axle single-unit trucks); 20 tons for SU5 & SU6 (5 and 6 axle single-unit trucks); 22 tons for SU7 (7 axle single-unit trucks); 31 tons Type 3S2 (truck tractor/semitrailer); 40 tons Type 3-3 (truck and trailer). This bridge is also restricted to the following weights: 20,000 lbs. single axle; 34,000 lbs. tandem axle; 80,000 lbs. GVW; Weight Table 1 for combinations.
Last Updated
9/27/2023 7:00 PM

ORE99: MP 17.02
ORE99, 2 miles South of Talent

Construction Work
No to Minimum Delay
Lanes Affected
(Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Last Updated
8/08/2023 6:41 AM

ORE99: MP 19.36 to 20.11
ORE99E, Halsey

Commercial Vehicle Information
Informational only
Details
OR99E NB & SB MP 18.97 to MP 20.13 (Halsey) Effective June 19, 2023, this section of OR99E northbound and southbound will be restricted to 10 feet 00 inches in width at all hours. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is February 16, 2024.
Last Updated
9/27/2023 7:00 PM

ORE99E: MP 3.01
ORE99E, Albany

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Prepare to slow. Watch for workers.
Last Updated
9/10/2023 7:01 PM

ORE99E: MP 9.8
ORE99E, 1 mile North of Gladstone

Construction Work
Informational only
Comments
Right turn lane closed Monday through Friday from 7 a.m. to 4 p.m. on northbound OR 99E at Jennings Avenue.
Last Updated
9/10/2023 12:40 PM

ORE99E: MP 18.97 to 20.13
ORE99E, Halsey

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane (Southbound) 1 Lane
Comments
Road construction is occurring. Prepare to slow. Watch for workers. During construction expect lane shifts and shoulder closures. Be aware of side street closures and pedestrian detours. Work is expected to occur Monday through Friday, between 8:00 am to 5:00 pm. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=18751)
Last Updated
8/11/2023 5:17 AM

ORE99E: MP 20.3 to 21.8
ORE99E, Canby

Construction Work
No to Minimum Delay
Comments
No traffic impacts. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=18775)
Last Updated
7/16/2023 5:11 PM

ORE99W: MP 7.7 to 10.4
ORE99W, Tigard (north city limits)

Construction Work
Estimated delay under 20 minutes
Comments
Periodic nighttime lane closures from 9 p.m. to 5 a.m. Sunday through Thursday from I-5 to McDonald. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20435)
Last Updated
9/10/2023 12:41 PM

ORE99W: MP 58.9 to 60.31
ORE99W, 1 mile South of Rickreall

Construction Work
No to Minimum Delay
Comments
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Daytime shoulder work with work vehicles and equipment entering and exiting the highway. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21374)
Last Updated
9/07/2023 11:42 PM

HWY372: MP 9 to 21.98

Snow Zone
Informational only
Affected Area
Century Drive - West of Bend to Mt. Bachelor Ski Area
Minimum Chain Restriction
Carry chains or traction tires regardless of conditions. View more information on Chain Laws.