I-205: NB MP 6.4
I-205, Oregon City, Intersection with 10th St
Crash/Hazard
Informational only
- Comments
- A stall has the NB right lane closed at 10th Ave. Prepare to slow or move over for worker safety.
- Last Updated
- 8/31/2023 12:50 PM
I-205: MP 8.29 to 9.23
I-205, West Linn
Commercial Vehicle Information
Informational only
- Details
- I-205 NB MP 8.12 to MP 9.25 (West Linn) Effective August 7, 2023, this section of I-205 northbound will be intermittently restricted to 15 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads over 15 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 15, 2023.
- Last Updated
- 9/27/2023 7:00 PM
I-205: SB MP 8.32 to 11.06
I-205, West Linn
Construction Work
Estimated delay under 20 minutes
- Comments
- Nighttime lane closures on I-205 north and south 10 p.m. to 5 a.m. Speeds reduced. Single lane closures on Clackamette Drive, Willamette Falls Drive and OR 43 north. Auxiliary lane closure on OR 99E north. Pedestrian detours on OR 43 and OR 99E. Nighttime closures of the I-205 south off-ramp to OR 99E from 10 p.m. to 5 a.m.
- Last Updated
- 9/24/2023 9:17 AM
I-205: MP 8.64 to 9.51
I-205, Abernethy Bridge
Commercial Vehicle Information
Informational only
- Details
- I-205 NB MP 8.51 to MP 9.51 (Oregon City) Effective September 25, 2023, this section of I-205 northbound will be restricted to 12 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 29, 2023.
- Last Updated
- 9/27/2023 7:00 PM
I-205: MP 9.031
I-205, Abernethy Bridge
Commercial Vehicle Information
Informational only
- Details
- I-205 NB on-ramp from OR43 NB (West Linn) Effective June 15, 2023, the I-205 northbound on-ramp from OR43 northbound will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this work is October 1, 2023.
- Last Updated
- 9/27/2023 7:00 PM
I-205: MP 9.51
I-205, Abernethy Bridge
Commercial Vehicle Information
Informational only
- Details
- I-205 SB MP 9.47 to MP 9.33 (Oregon City) Effective August 21, 2023, this section of I-205 southbound will be intermittently restricted to 12 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM & 5 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 6, 2023.
- Last Updated
- 9/27/2023 7:00 PM
I-205: NB MP 21.1 to 22
I-205, Interstate 84
Construction Work
Estimated delay under 20 minutes
- Comments
- Shoulder closure on I-205 north between Glisan Street and Exit 22, on I-84 east and west. Nighttime lane closures in both directions of I-84. Nighttime closures of Exit 7 to Halsey Street from I-84 east.
- Last Updated
- 8/20/2023 2:39 PM
I-5: SB MP 295.9 to 296.1
I-5, 1 mile North of Portland, Intersection with SW Capitol Highway
Construction Work
Estimated delay under 20 minutes
- Comments
- SW 26th Avenue under I-5 is closed through spring 2024. Periodic shoulder closures on I-5.
- Last Updated
- 8/06/2023 9:11 AM
I-5: MP 300.73
I-5, Interstate 84
Commercial Vehicle Information
Informational only
- Details
- I-5 NB MP 300.81 to MP 300.89 (Portland) On Sunday, October 1, 2023, this section of I-5 northbound will be closed between the hours of 6:00 AM and 2:30 PM for the Portland Marathon.
- Last Updated
- 9/27/2023 7:00 PM
I-5: MP 302.29
I-5, I-405 North Interchange
Commercial Vehicle Information
Informational only
- Details
- I-5 NB MP 302.29 to MP 303.10 (Portland) Effective October 25, 2023, this section of I-5 northbound will be restricted to 14 feet 00 inches in width, between the hours of 10 PM and 5 AM. Loads wider than 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 26, 2023.
- Last Updated
- 9/27/2023 7:00 PM
I-5: MP 302.74
I-5, 1 mile North of I-405 North Interchange
Commercial Vehicle Information
Informational only
- Details
- I-5 NB MP 302.74 (Portland) Effective October 25, 2023, this section of I-5 northbound will be restricted to 18 feet 06 inches in height, between the hours of 10 PM and 5 AM. Loads wider than 18 feet 06 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 26, 2023.
- Last Updated
- 9/27/2023 7:00 PM
I-5: MP 308.38 to 308.18
I-5, Oregon Washington Border
Commercial Vehicle Information
Informational only
- Details
- I-5 SB MP 308.38 to MP 308.18 (Interstate Bridge-Portland) Effective October 14, 2023, this section of I-5 southbound will be closed nightly between the hours of 10 PM and 6 AM. The estimated completion date for this work is October 15, 2023.
- Last Updated
- 9/27/2023 7:00 PM
I-84: MP 0 to 0.82
I-84, Interstate 5
Commercial Vehicle Information
Informational only
- Details
- I-84 EB MP 0.00 to MP 0.90 (Portland) Effective October 13, 2023, this section of I-84 eastbound will be restricted to 12 feet 00 inches in width at night between the hours of 8 PM & 6 AM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 15, 2023.
- Last Updated
- 9/27/2023 7:00 PM
I-84: MP 1.36 to 0.921
I-84, Portland, Intersection with Lloyd Blvd
Commercial Vehicle Information
Informational only
- Details
- I-84 WB MP 0.921 to MP 1.36 (Portland) Effective October 13, 2023, this section of I-84 westbound will be intermittently restricted to 18 feet 00 inches in width at all hours. Loads over 18 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 15, 2023.
- Last Updated
- 9/27/2023 7:00 PM
I-84: MP 1.74
I-84, Portland, Intersection with 33rd Ave
Commercial Vehicle Information
Informational only
- Details
- I-84 WB MP 1.74 (Portland) Effective October 21, 2023, this section of I-84 westbound will be restricted to 16 feet 3 inches in height between the hours of 4 AM and 12 PM. Loads over 16 feet 3 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 21, 2023.
- Last Updated
- 9/27/2023 7:00 PM
I-84: WB MP 2 to 9.7
I-84, Portland, Intersection with 33rd Ave
Construction Work
Estimated delay under 20 minutes
- Comments
- Shoulder closure on I-205 north between Glisan Street and Exit 22, on I-84 east and west. Nighttime lane closures in both directions of I-84 Nighttime closures of Exit 7 to Halsey Street from I-84 east.
- Last Updated
- 8/20/2023 2:40 PM
I-84: MP 2.42 to 1.53
I-84, Portland, Intersection with 33rd Ave
Commercial Vehicle Information
Informational only
- Details
- I-84 WB MP 2.50 to MP 1.40 (Portland) Effective October 21, 2023, this section of I-84 westbound will be restricted to 24 feet 00 inches in width between the hours of 4 AM and 12 PM. Loads over 24 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 21, 2023.
- Last Updated
- 9/27/2023 7:00 PM
I-84: MP 4.11 to 7.1
I-84, Portland, Intersection with 58th Ave
Commercial Vehicle Information
Informational only
- Details
- I-84 EB & WB MP 4.10 to MP 7.22 (Portland) Effective Friday, October 6, 2023, this section of I-84 eastbound and westbound will be closed for the weekend starting at 10:00 p.m. and re-opening on Monday October 9, 2023. at 5:00 a.m.
- Last Updated
- 9/27/2023 7:00 PM
I-84: MP 5.01 to 5.95
I-84, Portland, Intersection with 82nd Ave
Commercial Vehicle Information
Informational only
- Details
- I-84 EB MP 5.00 to MP 6.00 (Portland) Effective August 8, 2023, this section of I-84 eastbound will be restricted to 14 feet 00 inches in width at night, between the hours of 9 PM & 5 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 20, 2023.
- Last Updated
- 9/27/2023 7:00 PM
I-84: MP 5.74 to 5.76
I-84, 1 mile East of Portland, Intersection with 82nd Ave
Commercial Vehicle Information
Informational only
- Details
- I-84 EB MP 5.74 to MP 5.76 (Portland) Effective May 21, 2023, this section of I-84 eastbound will be intermittently restricted to 17 feet 11 inches in height Sunday through Thursday nights between the hours of 8 PM & 5 AM. Friday nights between the hours of 8 PM & 8 AM. Saturday nights between the hours of 7 PM & 8:30 AM. Loads over 17 feet 11 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 30, 2023.
- Last Updated
- 9/27/2023 7:00 PM
I-84: MP 5.87 to 5.51
I-84, 1 mile East of Portland, Intersection with 82nd Ave
Commercial Vehicle Information
Informational only
- Details
- I-84 WB MP 5.6 to MP 6.35 (Portland) Effective August 8, 2023, this section of I-84 westbound will be restricted to 14 feet 00 inches in width at night, between the hours of 9 PM & 5 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 20, 2023.
- Last Updated
- 9/27/2023 7:00 PM
I-84: MP 6.29
I-84, 1 mile West of Interstate 205
Commercial Vehicle Information
Informational only
- Details
- I-84 EB MP 6.29 to MP 7.11 (Gresham) Effective September 29, 2023, this section of I-84 eastbound will be closed Sunday through Thursday nights between the hours of 10 PM & 5 AM, Friday nights between the hours of 10:30 PM & 6 AM, and Saturday nights between the hours of 10:30 PM & 6:30 AM. The estimated completion date for this work is October 2, 2023.
- Last Updated
- 9/27/2023 7:00 PM
I-84: MP 6.74
I-84, Interstate 205
Commercial Vehicle Information
Informational only
- Details
- I-84 WB MP 6.74 (Portland) Effective May 21, 2023, this section of I-84 westbound will be intermittently restricted to 15 feet 1 inch in height Sunday through Thursday nights between the hours of 8 PM & 5 AM. Friday nights between the hours of 8 PM & 8 AM. Saturday nights between the hours of 7 PM & 8:30 AM. Loads over 15 feet 1 inch in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 30, 2023.
- Last Updated
- 9/27/2023 7:00 PM
I-84: WB MP 12.52 to 16.67
I-84, Gresham, Intersection with 181st Ave
Construction Work
No to Minimum Delay
- Comments
- Nighttime detour I-84 east at I-205 from 10 p.m. to 5 a.m. Sept. 29-Oct. 2. Use I-205 to detour. Nighttime closures of the I-84 east off ramp to 122nd. Daytime lane closures on NE 238th Avenue from 9 a.m. to 3 p.m. Nighttime lane closures between I-205 and Marine Drive (Exit 17) Monday through Friday. Lane closures allowed Sunday to Thursday nights from 8 p.m. to 5 a.m., Friday night from 8 p.m. to 8 a.m. Saturday, Saturday night from 7 p.m. to 8:30 a.m. Sunday. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
- Last Updated
- 9/27/2023 2:55 PM
I-84: WB MP 13.03 to 10.08
I-84, Gresham, Intersection with 181st Ave
Maintenance Work
Estimated delay under 20 minutes
- Lanes Affected
- (Westbound) 2 Lanes
- Comments
- Road maintenance operations have the WB right two lanes closed from 181st to 122nd Ave Ave. Prepare to slow or move over for worker safety.
- Last Updated
- 9/27/2023 9:36 PM
I-84: MP 13.03 to 77
Snow Zone
Informational only
- Affected Area
- NE 181st in Troutdale east to just west of the Rowena Exit
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
I-84: MP 16.55
I-84, Troutdale
Commercial Vehicle Information
Informational only
- Details
- I-84 WB MP 16.55 (Troutdale) Effective March 16, 2023, this section of I-84 westbound will be intermittently restricted to 16 feet 11 inches in height Monday through Thursday nights between the hours of 8 PM & 5 AM, Friday nights between the hours of 8:30 PM & 8 AM, Saturday nights between the hours of 8:30 PM & 8:30 AM, and Sunday nights between the hours of 9 PM & 5 AM. Loads over 16 feet 11 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 30, 2023.
- Last Updated
- 9/27/2023 7:00 PM
I-84: MP 21.89
I-84, Corbett
Commercial Vehicle Information
Informational only
- Details
- I-84 WB MP 20.00 to MP 22.00 (Corbett) Effective October 2, 2023, this section of I-84 westbound will be intermittently restricted to 13 feet 00 inches in width Monday through Friday between the hours of 6 AM & 8 PM. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 4, 2023.
- Last Updated
- 9/27/2023 7:00 PM
US26: MP 0.32 to 1.32
US26, I-405
Commercial Vehicle Information
Informational only
- Details
- US26 EB MP 0.32 to MP 1.32 (Ross Island Way - Portland) On Sunday October 1, 2023, this section of US26 eastbound will be closed between the hours of 6:00 AM and 2:30 PM for the Portland Marathon.
- Last Updated
- 9/27/2023 7:00 PM
US26: WB MP 0.96 to 0.45
US26, 1 mile East of I-405
Maintenance Work
Estimated delay under 20 minutes
- Comments
- Road work has the WB right lane closed on the Ross Island Bridge. Prepare to slow or move over for worker safety.
- Last Updated
- 9/27/2023 7:52 PM
US26: MP 5.85 to 9.96
US26, Portland
Construction Work
Informational only
- Comments
- Lane closures, traffic shifts, shoulder closures and up to 20-minute traffic holds weekdays from 8 a.m. to 5 p.m. and at night from 9 p.m. to 5 a.m.
- Last Updated
- 7/16/2023 5:07 PM
US30: MP 3.94 to 6.51
US30, Portland
Construction Work
Estimated delay under 20 minutes
- Comments
- Periodic daytime and nighttime lane closures with flagging at Front and Bridge Avenues. Pedestrian impacts at some locations with temporary detours at intersection corners between NW Bridge Avenue and NW Kittridge Avenue. Bicycle use roadway travel lanes.
- Last Updated
- 9/24/2023 9:19 AM
US30: MP 11.93
HWY100, 5 miles East of Corbett
Commercial Vehicle Information
Informational only
- Details
- US30 (Historic Columbia River Hwy) MP 11.93 (Latourell Creek Bridge - east of Corbett) Effective June 18, 2020, US30 (Historic Columbia River Hwy) crossing Latourell Creek Bridge at MP 11.93 is restricted to the following weights: 27 tons for SU5 (5 axle single-unit truck); 28 tons for SU6 & SU7 vehicles (6 and 7 axle single-unit trucks).
- Last Updated
- 9/27/2023 7:00 PM
US30BY: MP 0.4 to 0.6
US30BP, Intersection with Lower Columbia River Highway US30
Construction Work
No to Minimum Delay
- Comments
- Pedestrian detours. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=37899)
- Last Updated
- 5/21/2023 4:12 PM
US30BY: MP 4.75 to 5.1
US30BP, Intersection with Pacific Highway I-5
Construction Work
No to Minimum Delay
- Comments
- Daytime lane closures on eastbound Lombard from Omaha to Lancaster Avenues Monday. Beginning Monday evening, around-the-clock lane closure on eastbound Lombard between Omaha and Mobile Avenues. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/R1ADACurbRamps.aspx)
- Last Updated
- 9/24/2023 9:21 AM
ORE213: MP 7.23 to 7.41
ORE213, Portland
Construction Work
Future Event: Informational only
- Expected Start Date
- 10/2/2023 8:00:00 AM
- Comments
- Expect daytime and nighttime lane closures on SE 82nd Avenue, with at least one lane open in each direction at a time. Project Description: We are repaving and making safety improvements on SE 82nd Avenue from SE Foster Road to SE Thompson Road. We will repave SE 82nd Avenue in both directions between SE Foster Road and SE Lindy Street. Pedestrian safety improvements from SE Foster to SE Thompson Road include four new Rectangular Rapid Flashing Beacons (RRFBs), upgrades to curb ramps that meet Americans with Disabilities Act (ADA) requirements and adding new sidewalks between SE Clatsop Street and SE Cornwell Street. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21177)
- Last Updated
- 9/27/2023 1:58 PM
ORE213: MP 7.25 to 8.41
ORE213, Portland
Commercial Vehicle Information
Informational only
- Details
- OR213 NB & SB MP 7.25 to MP 8.45 (Portland) Effective January 31, 2024, this section of OR213 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is July 18, 2024.
- Last Updated
- 9/27/2023 7:00 PM
ORE213: MP 7.25 to 8.41
ORE213, Portland
Commercial Vehicle Information
Informational only
- Details
- OR213 NB & SB MP 7.25 to MP 8.45 (Portland) Effective October 25, 2023, this section of OR213 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is December 29, 2023.
- Last Updated
- 9/27/2023 7:00 PM
ORE213: MP 7.25 to 8.41
ORE213, Portland
Commercial Vehicle Information
Informational only
- Details
- OR213 NB & SB MP 7.25 to MP 8.45 (Portland) Effective December 13, 2023, this section of OR213 northbound and southbound will be intermittently restricted to 10 feet 00 inches in width at night between the hours of 7 PM & 7 AM. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is February 16, 2024.
- Last Updated
- 9/27/2023 7:00 PM
ORE217: MP 0.04
ORE217, US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 NB off-ramp to Barnes Rd (Beaverton) Effective October 9, 2023, the OR217 northbound off-ramp to Barnes Road will be restricted to 18 feet 00 inches in width at night between the hours of 9 PM & 5 AM. Loads over 18 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 11, 2023.
- Last Updated
- 9/27/2023 7:00 PM
ORE217: SB MP 2 to 6
ORE217, 2 miles South of US 26
Construction Work
Estimated delay of 20 minutes - 2 hours
- Comments
- Periodic nighttime lane closures on OR 217 in both directions Sunday, Sept. 24 through Friday. Nighttime rolling slowdowns in both directions from 11 p.m. to 5 a.m. Thursday for utility work. Ongoing closures: One westbound lane on the Hall Boulevard overpass is closed between Scholls Ferry Road and Cascade Avenue until Thanksgiving. The OR 217 southbound Denney Road on-ramp is closed until October 2023. The left turn lane on the Greenburg Road northbound off-ramp is closed for several months. Left turns permitted from the middle lane. Auxiliary lane closures on OR 217 south from Scholls Ferry Road to OR 99W and from OR 99W to 72nd Avenue. Expect shoulder closures on OR 217, various on- and off-ramps, and on local roads near the highway ramps. Various on- and off-ramps temporarily narrowed. Pedestrian detours on the Denny Road overpass, Hall Boulevard overpass in Beaverton, and at the end of the OR 99W southbound off-ramp. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/OR217/Pages/default.aspx)
- Last Updated
- 9/24/2023 9:23 AM
ORE217: MP 2.26 to 2.7
ORE217, 2 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB Exit 2B on- and off-ramps to/from Allen Blvd (Beaverton) Effective January 1, 2022, the OR217 southbound Exit 2B on- and off-ramps to/from Allen Boulevard will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 28, 2023.
- Last Updated
- 9/27/2023 7:00 PM
ORE217: SB MP 2.85 to 3.19
ORE217, 3 miles South of US 26
Construction Work
Closure
Off Ramp
- Comments
- Road work has the OR 217 southbound Denney Road off-ramp and on-ramp closed for approximately five months. Use an alternate route. Ramps Affected.
- Last Updated
- 5/02/2023 5:00 AM
ORE217: MP 3.56
ORE217, 4 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB Exit 4A off-ramp to Hall Blvd (Beaverton) Effective January 24, 2022, the OR217 southbound Exit 4A off-ramp to Hall Boulevard will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 1, 2023.
- Last Updated
- 9/27/2023 7:00 PM
ORE217: MP 3.83
ORE217, 4 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB on-ramp from Hall Blvd (Beaverton) Effective January 19, 2022, the OR217 southbound on-ramp from Hall Boulevard will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 1, 2023.
- Last Updated
- 9/27/2023 7:00 PM
ORE217: MP 4.12 to 4.51
ORE217, 4 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB Exit 4B on- and off-ramps to/from OR210/Scholls Ferry Rd (Beaverton) Effective January 19, 2022, the OR217 southbound Exit 4B on- and off-ramps to/from OR210/Scholls Ferry Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 1, 2023.
- Last Updated
- 9/27/2023 7:00 PM
ORE217: MP 4.741
ORE217, 5 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 NB Exit 5 on-ramp from Greenburg Rd (Tigard) Effective August 15, 2023, the OR217 northbound Exit 5 on-ramp from Greenburg Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 30, 2023.
- Last Updated
- 9/27/2023 7:00 PM
ORE217: MP 4.78 to 5.17
ORE217, 5 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB on-ramp from Greenburg Rd (Beaverton) Effective January 26, 2022, the OR217 southbound on-ramp from Greenburg Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 1, 2023.
- Last Updated
- 9/27/2023 7:00 PM
ORE217: MP 5.13
ORE217, 5 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 NB Exit 5 off-ramp to Greenburg Rd (Tigard) Effective November 4, 2022, the OR217 northbound Exit 5 off-ramp to Greenburg Road will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this work is August 31, 2023.
- Last Updated
- 9/27/2023 7:00 PM
ORE217: MP 5.69
ORE217, 6 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB Exit 6 off-ramp to OR99W (Tigard) Effective November 4, 2022, the OR217 southbound Exit 6 off-ramp to OR99W will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this work is November 30, 2023.
- Last Updated
- 9/27/2023 7:00 PM
ORE43: MP 0 to 2.54
ORE43, Intersection with Mount Hood Highway US26
Commercial Vehicle Information
Informational only
- Details
- OR43 SB MP 0.00 to MP 2.71 (Portland) On Sunday October 1, 2023, this section of OR43 southbound will be closed between the hours of 6:00 AM and 2:30 PM, for the Portland Marathon.
- Last Updated
- 9/27/2023 7:00 PM
ORE8: MP 2.65 to 3.6
ORE8, Highway 217
Commercial Vehicle Information
Informational only
- Details
- OR8 EB & WB MP 2.67 to MP 3.60 (Beaverton) Effective August 15, 2022, this section of OR8 (Tualatin Valley Highway) will be restricted to 10 feet 00 inches in width Monday through Friday nights between the hours of 8:00 PM and 5:00 AM. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is September 29, 2023.
- Last Updated
- 9/27/2023 7:00 PM
ORE8: MP 2.81 to 7
ORE8, Highway 217
Construction Work
No to Minimum Delay
- Comments
- Nighttime lane closures from 8 p.m. to 5:30 a.m. in both directions on OR 8 and side streets. Nighttime lane closures at SW Hall Boulevard, SW 110th, SW Watson Avenue and SW Short Street. Daytime lane closures at SW 192nd Avenue, westbound OR 8 from 8 a.m. to 2 p.m.
- Last Updated
- 9/17/2023 1:58 PM
ORE99: MP -0.36
ORE99W, Portland
Commercial Vehicle Information
Informational only
- Details
- OR99W MP -0.36 (Steel Bridge - Portland) Effective October 28, 2019, OR99W crossing the Steel Bridge in Portland is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 2 & for Non-Divisible Loads 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3.
- Last Updated
- 9/27/2023 7:00 PM
ORE99: MP 1.31 to 1.43
ORE99W, I-405 South Interchange
Commercial Vehicle Information
Informational only
- Details
- OR99W/Naito Pkwy SB MP 1.31 to MP 1.43 (Portland) On Sunday October 1, 2023, this section of OR99W/Naito Parkway southbound will be closed between the hours of 6:00 AM and 2:30 PM for the Portland Marathon.
- Last Updated
- 9/27/2023 7:00 PM
ORE99: MP 1.41
ORE99W, I-405 South Interchange
Commercial Vehicle Information
Informational only
- Details
- OR99W (Pacific Hwy) MP 1.41 (Arthur Street Bridge - Portland) OR99W crossing Arthur Street Bridge at MP 1.41 is restricted to the following weights: 33 tons for SU6 (6 axle single-unit trucks); and 34 tons for SU7 (7 axle single-unit trucks).
- Last Updated
- 9/27/2023 7:00 PM
ORE99: MP 3.7 to 1.47
ORE99E, Portland
Commercial Vehicle Information
Informational only
- Details
- OR99E NB MP 1.47 to MP 3.72 (Portland) On Sunday October 1, 2023, this section of OR99E will be restricted to 18 feet 00 inches in width between the hours of 6:00 AM and 2:30 PM, for the Portland Marathon.
- Last Updated
- 9/27/2023 7:00 PM
ORE99: MP 11.81
ORE99E, Oregon City
Commercial Vehicle Information
Informational only
- Details
- OR99E off-ramp to I-205 NB (Oregon City) Effective September 30, 2023, the OR99E off-ramp to I-205 northbound will be restricted to 18 feet 00 inches in width at all hours. Loads over 18 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is March 1, 2024.
- Last Updated
- 9/27/2023 7:00 PM
ORE99E: MP 9.8
ORE99E, 1 mile North of Gladstone
Construction Work
Informational only
- Comments
- Right turn lane closed Monday through Friday from 7 a.m. to 4 p.m. on northbound OR 99E at Jennings Avenue.
- Last Updated
- 9/10/2023 12:40 PM
ORE99W: MP 7.7 to 10.4
ORE99W, Tigard (north city limits)
Construction Work
Estimated delay under 20 minutes
- Comments
- Periodic nighttime lane closures from 9 p.m. to 5 a.m. Sunday through Thursday from I-5 to McDonald. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20435)
- Last Updated
- 9/10/2023 12:41 PM