West Oregon Road Conditions

Filters

Note: Available filter options are derived from active events; the absence of a filter option indicates no active events contain that information.

Current Travel Conditions By Route

Closure

US197, Intersection with Columbia River Highway I-84 MP 0 - 1

The Dalles bridge will be closed to all traffic and pedestrians from 8pm Thurs until Mon 6am, please follow posted detour route signs.

Weekend full closures of the bridge will resume September 29th and will continue each weekend (except holiday weekends of Thanksgiving, Christmas & New Years)

Updated
9/30/2022 11:05:00 AM

I-5: SB MP 99 to 136

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. This project will replace ADA sidewalk ramps at several locations in southern Oregon. Pedestrians will be provided alternate routes when sidewalks are closed. Ramps are mostly finished in Canyonville, Tri City and Roseburg. Some final paving work along shoulders remains, but probably will not impact traffic or pedestrians.
Last Updated
9/12/2022 8:08 PM

I-5: NB MP 113 to 118

Construction Work
No to Minimum Delay
Lanes Affected
(Southbound) 2 Lanes (Northbound) 2 Lanes
Comments
Road construction is occurring causing no to minimum delays. Use caution. This project will pave five miles of I-5 and build climbing lanes on the northbound and southbound approach to Roberts Mountain. Watch for intermittent lane closures and ramp work Sunday through Friday nights (9 p.m. to 6 a.m.) installing pavement markings.
Last Updated
9/26/2022 8:56 PM

I-5: MP 117.74

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 117.5 to MP 119 (Roseburg) Effective September 18, 2022, this section of I-5 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM & 7 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 30, 2022.
Last Updated
9/30/2022 10:00 AM

I-5: NB MP 118 to 126

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 2 Lanes
Comments
Road construction is occurring. Use caution. This project will pave eight miles of I-5 between the Garden Valley interchange and Roberts Creek and install or replace sidewalk ADA ramps. Watch for intermittent weeknight (Sunday night to Friday morning, 9 p.m. to 6 a.m.) ramp, lane and shoulder closures.
Last Updated
9/12/2022 8:11 PM

I-5: MP 119.18 to 125.32

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 119 to MP 125.5 (Roseburg) Effective September 18, 2022, this section of I-5 northbound and southbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights 1/2 hour after sunset to 1/2 before sunrise. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 30, 2022.
Last Updated
9/30/2022 10:00 AM

I-5: MP 119.18 to 125.32

Commercial Vehicle Information
Informational only
Details
I-5 NB & SB MP 119 to MP 125.5 (Roseburg) Effective September 18, 2022, this section of I-5 northbound will be intermittently restricted to 16 feet 00 inches in height and southbound will be restricted to 16 feet 05 inches in height Sunday through Thursday nights 1/2 hour after sunset to 1/2 before sunrise. Loads over 16 feet 00 inches in height northbound or over 16 feet 05 inches in height southbound may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is September 30, 2022.
Last Updated
9/30/2022 10:00 AM

I-5: MP 138.3 to 140.48

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 138 to MP 141 (Oakland) Effective October 11, 2022, this section of I-5 northbound will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 6 PM & 7 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 18, 2022.
Last Updated
9/30/2022 10:00 AM

I-5: MP 140.48

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 140 on-ramp from Old Hwy 99/DC388 (Oakland) Effective October 11, 2022 the I-5 northbound Exit 140 on-ramp from Old Hwy 99/DC388 will be intermittently closed Sunday through Friday nights between the hours of 6 PM & 7 AM. The estimated completion date for this project is October 18, 2022.
Last Updated
9/30/2022 10:00 AM

I-5: SB MP 148

Crash/Hazard
No to Minimum Delay
Comments
A crash has occurred causing no to minimum delays. Use caution.
Last Updated
9/30/2022 12:01 AM

I-5: MP 148.201 to 150.761

Commercial Vehicle Information
Informational only
Details
I-5 NB MP 148 to MP 151 (Rice Hill) Effective October 9, 2022, this section of I-5 northbound will be intermittently restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 6 PM & 7 AM. Loads over 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 13, 2022.
Last Updated
9/30/2022 10:00 AM

I-5: MP 148.41

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 148 on-ramp from Rice Hill/John Long Rd (Rice Hill) Effective October 9, 2022 the I-5 northbound Exit 148 on-ramp from Rice Hill will be intermittently closed Sunday through Friday nights between the hours of 6 PM & 7 AM. The estimated completion date for this project is October 13, 2022
Last Updated
9/30/2022 10:00 AM

I-5: MP 150.001

Commercial Vehicle Information
Informational only
Details
I-5 NB Exit 150 on- and off-ramps to/from Yoncalla/Drain/Eagle Valley Rd (Eagle Valley) Effective September 25, 2022, the I-5 northbound Exit 150 on- and off-ramps to/from Yoncalla/Drain/Eagle Valley Rd (Eagle Valley) will be intermittently closed Sunday through Friday nights between the hours of 6 PM & 7 AM. The estimated completion date for this project is September 29 , 2022.
Last Updated
9/30/2022 10:00 AM

I-5: MP 151.81

Commercial Vehicle Information
Informational only
Details
I-5 MP 151.81 Wilson Rd crossing over I-5 (Yoncalla) Wilson Rd crossing over I-5 is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
9/30/2022 10:00 AM

US101: MP 141.44 to 141.83

Maintenance Work
No to Minimum Delay
Comments
Bridge work is occurring causing no to minimum delays. Use caution.
Last Updated
7/26/2022 6:16 AM

US101: MP 141.67

Commercial Vehicle Information
Informational only
Details
US101 MP 141.67 (Yaquina Bay Bridge - Newport) Effective March 1, 2013, the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW, Weight Table 3 for non-divisible loads. Non-divisible loads exceeding these weights (up to Weight Table 5) may cross the bridge if they stop traffic/straddle the centerline and are the only vehicle on the bridge when crossing. Certified flaggers are required to stop both northbound and southbound traffic. The rolling stop method is not allowed.
Last Updated
9/30/2022 10:00 AM

US101: MP 190.98

Commercial Vehicle Information
Informational only
Details
US101 MP 190.98 (Siuslaw River Bridge - Florence) Effective March 17, 2003, the Siuslaw River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3 for non-divisible loads.
Last Updated
9/30/2022 10:00 AM

US101: MP 202.7 to 213.2

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. This project replaces the rails and makes other repairs on two U.S. 101 bridges in Douglas County: Tahkenitch Creek (MP 202.7) and Ranch Road south of Reedsport (MP 213.2). At Takhenitch Creek, a portable traffic signal is in use. Expect brief delays. At the bridge over Ranch Road south of Reedsport, watch for a traffic alignment change and traffic control devices. Flaggers will provide traffic control as needed.
Last Updated
9/12/2022 8:01 PM

US101: MP 261 to 275

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. This project will improve safety for pedestrians in Bandon by bringing several highway curb ramps into compliance with the Americans with Disabilities Act and installing a new pedestrian crossing at the intersection of U.S. 101 and 9th Street. The project also will replace ADA sidewalk ramps in Camas Valley and Winston. In Bandon, watch for intermittent lane and shoulder closures along U.S. 101. Alternate routes will be identified for pedestrians during sidewalk construction.
Last Updated
9/12/2022 8:09 PM

US20: MP 0.3 to 0.55

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) Median , 2 Lanes , Shoulder (Eastbound) Median , 2 Lanes , Shoulder
Comments
Road construction is occurring. Use caution. Work being done at night, Sunday through Thursday nights from 7:00PM - 6:00AM.
Last Updated
6/15/2022 11:42 AM

US20: MP 7 to 4.6

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Night work for paving Sunday-Tuesday nights (Sept 25-27th from 7PM-6AM)
Last Updated
9/26/2022 7:17 PM

US20: MP 26.64 to 30.35

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes , Shoulder (Eastbound) 2 Lanes , Shoulder
Comments
Road construction is occurring. Use caution. During construction expect delays up to 20 minutes. Work is expected to occur Monday through Friday, between 7:00am to 5:00pm.
Last Updated
7/12/2022 7:20 AM

US20: MP 30.2 to 30.8

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. During construction expect single lane closures and lane shifts. Work is expected to occur Monday through Friday, between 8:00am to 4:00pm.
Last Updated
4/28/2022 3:39 PM

US20: MP 54 to 57

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Expect single lane closures and delays up to 20 minutes weekdays between 6:00am to 6:00pm.
Last Updated
9/27/2022 7:48 AM

US20: MP 56.6

Commercial Vehicle Information
Informational only
Details
US20 EB & WB MP 55.90 to MP 56.90 (Cascadia) Effective April 4, 2022, this section of US20 eastbound and westbound will be restricted to 12 feet 00 inches in width Mondays through Fridays 1/2 before sunrise to 1/2 after sunset. Loads over 12 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is October 12, 2022.
Last Updated
9/30/2022 10:00 AM

ORE126: MP 15.19

Commercial Vehicle Information
Informational only
Details
OR126 Right-of-Way MP 15.19 (Knowles Creek Bridge, east of Mapleton) Effective December 1, 2015, all vehicles must be centered on the bridge when crossing. This bridge is NOT on the OR126 mainline.
Last Updated
9/30/2022 10:00 AM

ORE138: MP 17.95

Commercial Vehicle Information
Informational only
Details
OR138 EB & WB MP 17.95 (Lone Rock Bridge - Glide) Effective October 3, 2022, this section of OR138 eastbound and westbound, across the Lone Rock Bridge, will be restricted to 14 feet 00 inches in height at all hours, structural steel repairs on the existing Lone Rock Bridge, will prevent loads from straddling the center line. The estimated completion date for this work is March 1, 2023.
Last Updated
9/30/2022 10:00 AM

ORE138: EB MP 22 to 38

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. Use caution in this wildfire recovery work zone. Ongoing activities include hazard tree removal, cleanup, and maintenance operations. Watch for intermittent lane closures from milepost 22 to 38 and expect delays up to 20 minutes. Flaggers and pilot cars will provide traffic control as needed.
Last Updated
9/12/2022 8:18 PM

ORE164: MP 6.24

Commercial Vehicle Information
Informational only
Details
OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge - Jefferson) OR164 crossing the Santiam River Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW. Weight Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Last Updated
9/30/2022 10:00 AM

ORE228: MP 20.59 to 21.38

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. During construction expect delays up to 20 minutes. Work is expected to occur Monday through Friday, between 7:00am to 5:00pm.
Last Updated
7/21/2022 8:13 PM

ORE241: MP 4.5 to 6.5

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. This two-year (2021-22) project will replace 15 culverts and 12 tide-gates as well as repair five existing culverts. Construction in 2022 will involve replacing five culverts and tide gates, and adding liners to several others. Starting Monday, July 11, watch for intermittent lane closures through the work zone. Some delays will be 5-10 minutes, but 20-minute delays may be necessary at times. Traffic control will be provided by flaggers.
Last Updated
9/26/2022 8:55 PM

ORE34: MP 0.13

Commercial Vehicle Information
Informational only
Details
Old OR34 EB MP 0.13 (Willamette River / Van Buren St Bridge - Corvallis) Effective March 24, 2021, Old OR34 eastbound crossing Willamette River (Van Buren St) Bridge is restricted to 12 tons for all vehicles.
Last Updated
9/30/2022 10:00 AM

ORE36: MP 10.8

Crash/Hazard
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Hazardous tree or vegetation. Use caution.
Last Updated
9/30/2022 12:50 PM

ORE38: MP 16

Construction Work
No to Minimum Delay
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring causing no to minimum delays. Use caution. This project replaces the 1929 Scottsburg Bridge on a new alignment. During construction, Oregon 38 will remain open at all times. Oregon 38 is limited to a single lane through the work zone. Watch for a temporary traffic signal or flaggers. Use caution and watch for stopped traffic. Expect delays up to 20 minutes. Main Street is now closed for demolition of the old bridge. A short section of Scottsburg West Road is open. Lutsinger Creek Road remains open and access is marked in a temporary location while road construction continues. Side road traffic need to wait for the pilot car before proceeding.
Last Updated
9/12/2022 8:07 PM

ORE42: WB MP 2.47

Maintenance Work
Estimated delay under 20 minutes
Lanes Affected
(Eastbound) 1 Lane
Comments
Road maintenance operations are occurring. Use caution.
Last Updated
9/30/2022 7:26 AM

ORE42: MP 9.6 to 15.2

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments
Road construction is occurring. Use caution. This project will repave more than five miles of Oregon 42 through Coquille, level the roadway between West Central Blvd. and the Oregon 42S junction (milepost 9.9-10.8), replace ADA sidewalk ramps and make other improvements. Oregon 42 is limited to one lane in each direction between West Central Blvd. and the Oregon 42S junction. At times, this area may be limited to a single travel lane, with flaggers providing traffic control. Watch for congestion and expect delays. The lane closures will allow workers to replace a 48” culvert. Watch for intermittent lane closures in the two-mile section of Oregon 42 between Cedar Point Road and 4th Ct. for paving work. Flaggers will provide traffic control as needed. Expect delays and drive with caution through the work zone.
Last Updated
9/12/2022 8:16 PM

ORE42: MP 35.44 to 35.59

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution.
Last Updated
8/23/2022 9:50 PM

ORE42: MP 45 to 52

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 1 Lane (Eastbound) 1 Lane
Comments
Road construction is occurring. Use caution. This project paves seven miles of highway (MP 45.8-52.6), repairs 11 bridges, repairs a slide area (MP 49.5) and adds protective rock screen (MP 50.0). Construction is scheduled for completion in September. Watch for intermittent lane closures with flaggers and delays, Monday-Thursday (7 a.m. to 6 p.m.) and Friday (7 a.m. to 3 p.m.).
Last Updated
9/12/2022 7:57 PM

ORE42: MP 58

Crash/Hazard
No to Minimum Delay
Lanes Affected
(Eastbound) 1 Lane
Comments
An animal has been struck and is creating a hazard. There should be no to minimum delay to traffic. Use caution.
Last Updated
9/30/2022 8:05 AM

ORE501: MP 0.1

Commercial Vehicle Information
Informational only
Details
OR501 MP 0.10 (North Fork Alsea River Bridge - Alsea) Effective February 24, 2022, OR501 crossing the North Fork Alsea River Bridge is restricted to 33 tons for SU7 (7 axle single-unit trucks).
Last Updated
9/30/2022 10:00 AM

ORE569: MP 7.63

Commercial Vehicle Information
Informational only
Details
OR569 EB MP 7.63 (Eugene) Effective August 15, 2022 this section of OR569 (Beltline) will be intermittently restricted to 18 feet 2 inches in height, Sunday through Thursday nights between the hours of 9:30 PM & 5:00 AM. Loads over 18 feet 2 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 18, 2022.
Last Updated
9/30/2022 10:00 AM

ORE569: MP 8.25 to 10.08

Commercial Vehicle Information
Informational only
Details
OR569 EB & WB MP 8.10 to MP 10.10 (Eugene) Effective August 15, 2022 this section of OR569 (Beltline) will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 9:30 PM & 5:00 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 18, 2022.
Last Updated
9/30/2022 10:00 AM

ORE569: EB MP 8.5

Construction Work
No to Minimum Delay
Off Ramp
Comments
Road construction is occurring causing no to minimum delays. Use caution. Ramps Affected. Intermittent ADA ramp and traffic signal work throughout the end of the year.
Last Updated
9/22/2022 2:36 PM

ORE569: EB MP 8.7 to 11.6

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Barrier work: Left lane closed between MP 8.7 – MP 11.6 for both Eastbound and Westbound lanes starting at 8 PM – 5 AM.
Last Updated
8/31/2022 2:33 PM

ORE569: MP 10.64

Commercial Vehicle Information
Informational only
Details
OR569 EB MP 10.64 (Eugene) Effective August 15, 2022 this section of OR569 (Beltline) will be intermittently restricted to 15 feet 6 inches in height, Sunday through Thursday nights between the hours of 9:30 PM & 5:00 AM. Loads over 15 feet 6 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 18, 2022.
Last Updated
9/30/2022 10:00 AM

ORE569: MP 10.64 to 11.66

Commercial Vehicle Information
Informational only
Details
OR569 EB & WB MP 10.10 to MP 11.68 (Eugene) Effective August 15, 2022 this section of OR569 (Beltline) will be intermittently restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 PM & 5:00 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 18, 2022.
Last Updated
9/30/2022 10:00 AM

ORE58: MP 56 to 70

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments
Road construction is occurring. Use caution. Paving work is occurring during the day between 6:00 am and 8:00 pm Monday through Friday. Expect delays of up to 20 minutes.
Last Updated
9/27/2022 10:02 AM

ORE99: MP 5.78

Construction Work
Future Event: Closure with Detour
Expected Start Date
10/3/2022 7:00:00 PM
Lanes Affected
(Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder
Comments
Road construction has closed the road; a detour is in place. Use an alternate route. Front Street (Creswell)- Construction will begin October 3rd. Night time work 7:00 PM to 7:00 AM. Full closure of the Railroad and Front Street intersection starting Friday, October 7th at 7:00 AM to Tuesday, October 11th 7:00 AM.
Last Updated
9/28/2022 3:21 PM

ORE99: MP 5.78

Commercial Vehicle Information
Informational only
Details
OR99 NB & SB at MP 5.78 (Oregon Ave - Creswell) Effective October 7, 2022, this section of OR99 northbound and southbound, will be closed continuously at all hours. The estimated completion date for this work is October 11, 2022.
Last Updated
9/30/2022 10:00 AM

ORE99: MP 6.81

Commercial Vehicle Information
Informational only
Details
OR99 MP 6.81 (Hill Creek Bridge - Creswell) Effective February 15, 2022, OR99 crossing Hill Creek Bridge is restricted to the following weights: 30 tons for SU6 (6 axle single-unit trucks); 31 tons for SU7 (7 axle single-unit trucks).
Last Updated
9/30/2022 10:00 AM

ORE99: MP 13.8 to 14.3

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Cottage Grove Urban Upgrade Project: Currently placing storm pipe through the median section. Brief Flagging as needed. Later stages will have sidewalks, sidewalk ramps, illumination, signals and a pedestrian center island with push buttons.
Last Updated
8/31/2022 2:30 PM

ORE99: MP 13.87 to 14.33

Commercial Vehicle Information
Informational only
Details
OR99 NB & SB MP 13.83 to MP 14.33 (Cottage Grove) Effective August 8, 2022, this section of OR99 northbound and southbound will be restricted to 12 feet 00 inches in width Sunday through Saturday between the hours of 9 AM & 4 PM. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is November 30, 2022.
Last Updated
9/30/2022 10:00 AM

ORE99: MP 116.74 to 109.77

Construction Work
Estimated delay under 20 minutes
Lanes Affected
(Northbound) Median , 2 Lanes , Shoulder (Southbound) Median , 2 Lanes , Shoulder
Comments
Road construction is occurring. Use caution. Paving work continues Monday night (9/19) at the intersection of 99 with Milliron and Tuesday night at the 99 and Highway 36 intersection. Expect lane shifts and flaggers. Expect survey work this week also and use caution.
Last Updated
9/19/2022 9:36 AM

ORE99E: SB MP 0.4 to 0.45

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. Improvements being made to intersection of OR99E and Airport Rd/Albany Ave, including new signals, ADA ramps, and widening work on Airport Rd. Work being done at night, Sunday through Thursday nights from 7:00PM - 6:00AM
Last Updated
6/15/2022 11:13 AM

ORE99E: MP 18.97 to 20.13

Construction Work
Estimated delay under 20 minutes
Comments
Road construction is occurring. Use caution. During construction expect lane shifts and shoulder closures. Be aware of side street closures and pedestrian detours. Work is expected to occur Monday through Friday, between 8:00 am to 5:00 pm.
Last Updated
8/07/2022 8:21 AM

ORE99W: MP 84.49

Construction Work
Informational only
Comments
Road construction is or will be occurring. Use caution. New traffic flow pattern at Crystal Lake Dr/Avery Ave. The new bike signal is fully operational as of 8/18. Please watch for people biking who will be using the new signal and diagonal crossing.
Last Updated
9/16/2022 7:32 PM